background image

Pre drill 

hole

50mm           

screw

3

b

b

b

b

b

b

Pre drill 

hole

50mm           

screw

Pre drill 

hole

50mm           

screw

3

2

a

a

a

a

a

a

b

b

b

b

2

a

a

a

b

b

a

a

a

a

a

a

b

b

b

a

P 5

Please retain product label and instructions for future reference

             

Step 8

Place floors on a firm and level base, ensure 

base has suitable drainage  free from areas 

where standing water can collect.  (

see front 

page on base requirements

).  

Ensure floors are flush to each other and fix 

using 8x50mm screws. Alternate fixing 

positions along the length of the floors.

*NOTE: The floors do NOT connect by a

tongue and groove fixing.

8x50mm Screws

8

8

Step 9

Place the assembled plain gable

and first plain side onto the floor 

and fix in place.

 

Fix the corners with 50mm

 

screws.

 

Do not secure the building

 

to the floor until the roof is

 

fixed.

3x50mm Screws

a

b

Step 10

Following the same method outlined

in step 9, attach the next plain side &

the window side onto the assembly.

 

Fix the panels with 50mm

 

screws.

 

Do not secure the building

 

to the floor until the roof is

 

fixed.

6x50mm Screws

a

b

Pre drill 

hole

50mm           

screw

Step 11

Following the same method outlined

in step 9, attach the door gable & the 

remaining window side onto the 

assembly.

 

Fix the panels with 50mm

 

screws.

 

Do not secure the building

 

to the floor until the roof is

 

fixed.

9x50mm Screws

a

b

Summary of Contents for 01GRODB1008-V3

Page 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Page 2: ...x16 16mm Screws x14 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 P 2 01GRODB1008 V3 Overall Dimens...

Page 3: ...r panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 15 14 14 Step 3 Fix the door strips onto the front gable using 4x30mm screws for...

Page 4: ...and instructions for future reference Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window pan...

Page 5: ...a tongue and groove fixing 8x50mm Screws 8 8 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Page 6: ...e lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per r...

Page 7: ...a boards to the front and rear of the building using 3x40mm screws per fascia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards...

Page 8: ...ernal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism...

Reviews: