Pre drill
hole
50mm
screw
3
b
b
b
b
b
b
Pre drill
hole
50mm
screw
Pre drill
hole
50mm
screw
3
2
a
a
a
a
a
a
b
b
b
b
2
a
a
a
b
b
a
a
a
a
a
a
b
b
b
a
P 5
Please retain product label and instructions for future reference
Step 8
Place floors on a firm and level base, ensure
base has suitable drainage free from areas
where standing water can collect. (
see front
page on base requirements
).
Ensure floors are flush to each other and fix
using 8x50mm screws. Alternate fixing
positions along the length of the floors.
*NOTE: The floors do NOT connect by a
tongue and groove fixing.
8x50mm Screws
8
8
Step 9
Place the assembled plain gable
and first plain side onto the floor
and fix in place.
Fix the corners with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
3x50mm Screws
a
b
Step 10
Following the same method outlined
in step 9, attach the next plain side &
the window side onto the assembly.
Fix the panels with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
6x50mm Screws
a
b
Pre drill
hole
50mm
screw
Step 11
Following the same method outlined
in step 9, attach the door gable & the
remaining window side onto the
assembly.
Fix the panels with 50mm
screws.
Do not secure the building
to the floor until the roof is
fixed.
9x50mm Screws
a
b