Summary of Contents for Heartland VALUE Series

Page 1: ...duct information call our toll free number 1 800 577 9663 or email customerservice heartlandind com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8...

Page 2: ...This page intentionally left blank...

Page 3: ...isted on page 7 CHECK ALL PARTS Inventory all parts listed on pages 5 6 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to...

Page 4: ...or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best su...

Page 5: ...eated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for...

Page 6: ...R TRIM 2 Quart Use 100 acrylic latex exterior paint REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to c...

Page 7: ...23 7 8 2 5 x 7 6 x 60 6 cm LW x2 2 x 3 x 34 2 5 x 7 6 x 86 4 cm CI 2 x 3 x 46 1 4 2 5 x 7 6 x 117 5 cm NH x4 FZ x13 2 x 3 x 66 1 2 2 5 x 7 6 x 168 9 cm OZ x4 2 x 3 x 70 1 4 2 5 x 7 6 x 178 4 cm x1 PS...

Page 8: ...6 cm 7 16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm Roof panels are 7 16 1 1 cm thick NOTE Panel parts are not stamped NOTE Panel parts are not stamped 7 16 x 7 7 8 x 96 1 1 x 20 x 243 8 cm x2 x2 NOTE Pane...

Page 9: ...or best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUI...

Page 10: ...36 2 cm x6 x1 2 x 4 x 92 1 2 5 1 x 10 2 x 235 cm x1 2 x 4 x 48 5 1 x 10 2 x 121 9 cm x1 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm x1 2 x 4 x 24 5 1 x 10 2 x 61 cm HINT For easier nailing stand on frame Flush...

Page 11: ...ent will be approximately 150 15 16 383 4 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the fr...

Page 12: ...me is square by installing 1 panel and squaring frame Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The m...

Page 13: ...the 3 4 measurement on the floor joists 5 x152 2 5 1 cm Secure panels using 2 nails 6 apart on edges and 12 apart inside panels 3 4 GAUGE BLOCK GAA FLOOR PANELS 11 DOOR Grid lines up 6 15 2 cm 3 4 1 9...

Page 14: ...stalling floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over...

Page 15: ...L EAVE SIDE WALLS 3 7 6 cm x28 22 1 4 46 1 4 70 1 4 70 1 4 94 1 4 116 1 2 46 1 4 70 1 4 66 1 2 56 5 cm 117 5 cm 178 4 cm 178 4 cm 239 4 cm 295 9 cm 117 5 cm 178 4 cm 168 9 cm 1 1 2 3 8 cm 13 FZ x6 2 x...

Page 16: ...e panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3...

Page 17: ...n edges and 12 apart inside panel Place 23 7 8 x 72 panel on frame as shown with primed side facing up flush with installed panel Secure panel using 2 nails 6 apart on edges and 12 apart inside panel...

Page 18: ...S Flush 16 BACK WALL FRAME 1 1 2 3 8 cm 2 1 2 6 4 cm 34 86 4 cm 45 1 2 115 6 cm 45 1 2 115 6 cm 91 231 1 cm 1 1 2 3 8 cm 1 BEGIN CI PS PARTS REQUIRED 2 3 7 6 cm Nails 3 7 6 cm x2 Center PS flush on CI...

Page 19: ...cm 2 1 2 6 4 cm Fig B Fig A Center PT on CI on edge on floor as shown Nail PT to CI using 2 3 Nails Fig A Center CI flush on PS on flat using a gusset as a temporary spacer 3 7 6 cm BACK WALL FRAME U...

Page 20: ...3 4 1 9 cm 2 Nails x1 Place left panel on back frame as shown with primed side facing up BEGIN 1 BACK WALL PANELS PARTS REQUIRED For squareness maintain flush and 3 4 measurement along panel edges Ens...

Page 21: ...ck frame as shown with primed side facing up and flush to panel 2 BACK WALL PANELS PARTS REQUIRED FINISH You have finished installing your back wall panels Ensure 34 86 4 cm between PT and PS Secure u...

Page 22: ...3 8 cm x1 PT 3 8 x 20 x 72 1 x 50 8 x 182 9 cm x2 Orient PT on edge and place left panel on PT as shown with primed side facing up Use BV as a temporary support as shown Nail using 2 nails 4 apart BEG...

Page 23: ...1 2 5 cm 1 2 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 56 142 2 cm 17 1 2 44 5 cm 17 1 2 44 5 cm Fig A Fig B BV BV Position BV on edge 2 1 2 from outside edge and 1 from bottom edge of left wall panel Fig A Nai...

Page 24: ...3 x 66 1 2 5 1 x 7 6 x 168 9 cm x1 FZ Flush NOTE Drive screws at an angle to avoid screw points protruding into the door opening Fig B 22 Flush Front wall panel CENTER CENTER Use to maintain 3 8 overh...

Page 25: ...is on top 2 BEGIN 1 Fig A 3 Nail two 3 nails between each stud through bottom plate 4 Y nished standing your right side wall Repeat steps 1 4 to stand your left wall FINISH 116 1 2 295 9 cm 3 7 6 cm S...

Page 26: ...panel to eave wall stud using 1 1 2 nails 6 apart Fig C 4 5 Secure back wall horizontal 2 x 3 using two 3 screws into back wall frame at an angle as shown You have finished standing your back wall Fi...

Page 27: ...C 2 Secure bottom plates using 3 3 nails on each side Fig C 3 You have finished standing your walls FINISH Nail front wall to side walls using 1 1 2 nails 6 apart Fig D 4 5 3 7 6 cm x26 1 1 2 3 8 cm I...

Page 28: ...x 4 x 54 1 16 5 1 x 10 2 x 129 8 cm x8 WI TEMPORARY SUPPORT OO x1 1 1 4 x 2 1 2 x 69 3 2 x 7 6 x 175 3 cm You will build FOUR assemblies Place 2 rafter halves WI in the corner of back and side walls R...

Page 29: ...ers NOTE Measurements from outside of panels Locate rafters directly over the wall studs Secure with 3 screw angled from bottom of top plate into rafter Screw through panel into end of rafter with 3 s...

Page 30: ...ft gable panel primed side up flush to right panel on LW with a 3 4 overhang on bottom Nail using 5 1 1 2 nails 6 apart Place LW on flat on floor 2 3 You have finished building your back wall gable pa...

Page 31: ...top plate overlapping the back wall panels 3 4 Fig A 2 3 You have finished installing your back wall gable panels FINISH BEGIN 1 BACK WALL GABLE PANELS PARTS REQUIRED BACK WALL 6 15 2 cm 3 4 1 9 cm 2...

Page 32: ...o right panel on DQ s with a 1 1 2 overhang on bottom Nail using 4 1 1 2 Nails Place DQ on flat on floor as shown 2 3 You have finished building your Front wall gable panels FINISH BEGIN 1 FRONT WALL...

Page 33: ...ED EQUAL x1 1 8 0 3 cm Drill Bit Secure window to DQ using 1 screw in top and bottom Fig B 2 1 2 5 cm Screws Center window in window opening as shown Make sure frame is at an equal distance from botto...

Page 34: ...be a slight reveal inside window 8 1 5 8 4 1 cm Screws 1 5 8 4 1 cm Screw WQ WO WO WQ Flush Flush 2 You have finished installing your window trim FINISH BEGIN 1 WO Flange CENTER TRIM ON WINDOW WINDOW...

Page 35: ...n front wall top plate overlapping front wall panels 2 3 You have finished installing your front wall gable panels FINISH BEGIN 1 FRONT WALL GABLE PANELS PARTS REQUIRED 2 5 1 cm Nails 2 5 1 cm Nails 2...

Page 36: ...s Stagger Screws WX 1 1 4 3 1 cm Screws WX Flush FINISH Install front gable trim WX Fig A as shown Attach trim to wall using 1 1 4 screws 7 1 4 apart Screw through panels into WX Repeat above steps 1...

Page 37: ...to the gable trim Fig D If necessary move the rafter to obtain the 1 2 measurement Secure panel using 2 2 nails in the corners 2 You must square the roof by attaching 1 panel first You will use the p...

Page 38: ...ter of the rafters Secure using 1 2 nail into each rafter Fig E Fig E 7 16 x 7 7 8 x 96 1 1 x 20 x 243 8 cm x1 ROOF PANELS 2 5 1 cm PARTS REQUIRED x10 Place the 7 7 8 x 96 roof panel flush to the uppe...

Page 39: ...rt on edges and 12 apart inside panel Repeat STEPS 1 6 to install roof panels on the opposite side For added roof strength panel layout should be reversed on opposite side Fig J 6 7 Flush Flush at sea...

Page 40: ...ch 71 3 4 Fig A Repeat Steps 1 2 to attach trim to all four corners Fig B You have attached your corner trim 3 4 2 x4 x4 3 8 x 1 3 4 x 71 3 4 1 x 4 4 x 182 2 cm 3 8 x 1 3 4 x 71 1 4 1 x 4 4 x 181 cm F...

Page 41: ...shown Tighten securely Attach temporary support GAA using 2 1 1 4 screws as shown Tighten securely HINT Look for 3 8 SPACER attached to doors OO GAA Make sure spacer is attached Tighten screws secure...

Page 42: ...loor using 4 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Attach te...

Page 43: ...ting Screws x9 PARTS REQUIRED x1 WR 19 32 x 3 x 63 1 5 x 7 6 x 160 cm 2 5 cm x8 3 4 1 9 cm x52 Install metal threshold Fig C 4 You have finished securing your door and trim FINISH BEGIN 1 Secure hinge...

Page 44: ...OOR WEATHERSTRIP FINISH On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using 7 2 screws through outside trim into OO F...

Page 45: ...0 8 cm Drill Bit Fig A x4 Loop contacts base PRE DRILL 4 HOLES 2 x 3 x 69 1 4 with bolt in open position OPEN POSITION Spring is loose 5 16 drill for bolt 1 deep OVER DOOR FRAME OO LOCATE AND PRE DRIL...

Page 46: ...e of all siding and trim Inside of doors and all 4 edges Note Prime all un primed exterior wood before painting Follow directions provided by manufacturer Snip bottom side of drip edge and bend over t...

Page 47: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 48: ...5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slot...

Page 49: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from e...

Page 50: ...f pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1...

Page 51: ...is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ri...

Page 52: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...