![background image](http://html1.mh-extra.com/html/backyard-products/heartland-value-series/heartland-value-series_assembly-manual_3359456014.webp)
DOOR
DO
OR
12
Check that the floor frame is level after installing floor panels.
Re-level if needed.
HINT:
IMPORTANT!
• The floor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process
to avoid over-handling of the walls.
BACK WALL
FRONT WALL
LEFT WALL
RIGHT WALL