background image

9’ x 9’ Muskoka Cabin  

Assembly Manual

Version #1.3 

May 12, 2022

1-888-658-1658                        www.outdoorlivingtoday.com            [email protected]

Page 1

In the event of a missing or broken piece, call the Outdoor Living Today Customer Support Line @ 1-888-658-1658 with-
in 30 days of the delivery of your purchase. It is our commitment to you to courier replacement parts, free of charge, 
within 10 business days of this notification. Replacement parts will not be provided free of charge after the 30 day 
grace period.  
 
All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing 
and workmanship. Costs incurred for customer installations are not included. 
 
Failure to use supplied parts included in this kit could result in poor product performance and may void your warranty. 
Please contact Outdoor Living Today’s Customer Toll Free Line if you plan to deviate from our written instructions.

 

Thank you for purchasing a  
9x9 Muskoka Cabin. Please take 
the time to identify all the parts 
prior to assembly. 

Safety Points and Other Considerations 
Our products are built for use based on 
proper installation on level ground and 
normal residential use. Please follow the  
instruction manual when building your  
shed and retain the manual for future  
maintenance purposes. 
 
Customers are responsible for ensuring 
a solid, level, well-draining site for  
construction.  
 
Please check with your local municipal 
or county by-laws before ordering this 
product to confirm it complies with  
building codes.

- Snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it  
   is advisable to sweep snow off roof frequently. 
- If the product is elevated, any structural and building code requirements are solely 
   the customer's responsibility, and should be abided by.  
- In areas with high or gusty wind conditions, it is advisable to install the structure 
   securely to the ground. 
- Have a regular maintenance plan to ensure screws, doors, windows and parts are 
   tightly affixed.  

 
Customer agrees to hold Outdoor Living Today and any Authorized 
Dealers free of any liability for improper installation, maintenance and 
repair.

Summary of Contents for Muskoka Cabin 9x9

Page 1: ...a Cabin Please take the time to identify all the parts prior to assembly Safety Points and Other Considerations Our products are built for use based on proper installation on level ground and normal r...

Page 2: ...e on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual...

Page 3: ...aced with one at each end of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 2 0 Cubi...

Page 4: ...or to assembly No Details Length Quantity 1 118 1 8 2 2 149 5 8 2 3 149 5 8 2 4 149 5 8 2 5 149 5 8 2 6 143 5 16 2 7 137 2 8 118 1 8 38 9 118 1 8 1 10 54 1 2 2 11 48 1 2 2 12 41 7 8 20 13 15 3 4 28 14...

Page 5: ...4 30 27 Roof Boards 5 8 x 5 1 8 76 3 4 30 28 Door 33 x 74 1 4 1 29 Window Side Walls 34 1 4 x 30 1 4 2 30 Window Front Walls 16 1 2 x 74 1 4 2 31 Window Loft 20 1 2 x 20 1 2 2 32 Metal Roof Panels 39...

Page 6: ...afety Glasses Work Gloves Safety Equipment Required Not Provided Wood Clamp Utility Knife MUSKOKA 9x9 HARDWARE PACKAGE S3 2 Screws x 125 Silicon Caulking x 80 1 4 x 2 Metal Roof Screw x 3 1 4 Nut Driv...

Page 7: ...wide x 110 1 4 deep 1 Lay out Part 36 Floor Frame and two Part 38 Floor Joists as illustrated above Position Joists so they are spaced equally in Floor Frame and flush with framing When correctly posi...

Page 8: ...rew Frames 35 36 together with 6 2 1 2 screws Complete 3 sets of floor frames 4 Screw each set of floor frames together with 24 2 1 2 screws Have the middle floor running the opposite direction as the...

Page 9: ...rt Fasten each runner with 10 3 screws 6 With floor runners attached to floor frame carefully flip the floor over and place on to your foundation Caution be careful when laying floor down not to bend...

Page 10: ...1 1 4 screws every 16 Approximately 75 Total Hint Use a chalk line to mark location of floor joists for easy screw placement 2 Lower Wall Section Exploded view of all parts necessary to complete the W...

Page 11: ...1 3 screw in each end 4 total Important Front door will be positioned here 10 Locate Part 8 2 Total Place one on each edge of floor frame and interlock in the notch of Part 1 Fasten each Part 8 with...

Page 12: ...nue adding Part 8 s and Part 13 s until your side walls are stacked 7 boards high 14 Locate Part 14 14 Total Position Part 14 s approximately 16 1 2 inches from Part 13 Use the Door and Windows from S...

Page 13: ...led Use a shim to keep the door off the ground If you find it easier to assemble the Bunkie without the doors you can leave them uninstalled till Step 23 16 Locate Parts 14 12 Total to finish lower wa...

Page 14: ...outdoorlivingtoday com Page 14 3 Upper Wall Section Exploded view of all parts necessary to complete the Wall Section Identify all parts prior to starting Part 12 20pcs Part 11 2pcs Part 6 2pcs Part...

Page 15: ...w opening while continue to build the walls 18 Continue building the walls as per Step 17 until you have added boards 4 high around the window opening 19 Locate Parts 11 2 Total Continue adding to you...

Page 16: ...s Place one on each side 21 Locate Parts 7 2 Total With boards stacked 6 high on either side of the window opening Place a Part 7 on top above the window opening 22 Locate Parts 6 2 Total Attach Part...

Page 17: ...arts necessary to complete the Wall Section Identify all parts prior to starting Part 2 2pcs Part 5 2pcs Part 4 2pcs Part 3 2pcs Part 9 1pc Part 8 11pcs Toll Free 1 888 658 1658 www outdoorlivingtoday...

Page 18: ...d out to fit over the front door and windows If the front door and windows have not been installed yet install them now 24 Locate Parts 2 2 Total Position on side walls and fasten 25 Locate Parts 8 4...

Page 19: ...ay com sales outdoorlivingtoday com Page 19 26 Locate Parts 3 2 Total Position on side walls and fasten 27 Locate Parts 8 3 Total Position and fasten 28 Locate Parts 4 2 Total Position on side walls a...

Page 20: ...al Position on side walls and fasten 30 First install Part 46 with 3 2 screws per strip to support floor boards Locate Parts 25 21 Total Place on loft rafters Parts b1 8 With floor boards in position...

Page 21: ...view of all parts necessary to complete the Wall Section Identify all parts prior to starting Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 21 Part g1 2pcs Part...

Page 22: ...s1 2 Total Position in top notch of gables with Part s2 on the bottom and part s1 on the top as illustrated above Evenly space from front to back approximatley 5 of overhang Ensure rafter ends are fl...

Page 23: ...vingtoday com sales outdoorlivingtoday com Page 23 7 Roof Section Exploded view of all parts necessary to complete the Wall Section Identify all parts prior to starting Part 26 30pcs Part 32 10pcs Par...

Page 24: ...lly on front and rear of Bunkie Lift up each panel and caulk the seam where the panels overlap 36 Locate Parts 34 8 Total 4 per side Position Foam Enclosures between Metal Roof Panels and Roof Boards...

Page 25: ...of roof on top of Roof Panels 38 Locate Parts 33 3 Total Position on peak of roof over top of Foam Enclosures Overlap the 3 Ridge Caps and space apart to achieve desired overhang Once in Position fast...

Page 26: ...orlivingtoday com sales outdoorlivingtoday com Page 26 8 Trim Section Exploded view of all parts necessary to complete the Wall Section Identify all parts prior to starting Part 18 2pcs Part 15 4pcs P...

Page 27: ...over Rafters and attach with 8 1 1 2 finishing nails per piece Attach all 4 pieces 40 Locate Parts 18 2 Total Position Flashing Rhomb over seam in Front Wind Flaps at peak of Roof Attach each with 4 1...

Page 28: ...per section Complete two railing sections Attach each Railing section to loft with 4 1 1 4 screws per railing section Part 19 2 Part 20 4 43 Locate Parts 22 to assemble the ladder Space steps evenly a...

Page 29: ...ts 43 45 bundled Attach with 3 1 1 2 finishing nails per piece 48 total 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 29 47 Lay out Floor Boards Part 24 on top of plywood...

Page 30: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 30 Plan of 1st floor in axis 1 2 A D...

Page 31: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 31 Plan of attic in axis 1 2 A D...

Page 32: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 32 Wall on axis A B...

Page 33: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 33 Wall on axis C D...

Page 34: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 34 Wall on axis 1...

Page 35: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 35 Pediment on axis A D Details...

Page 36: ...1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 36 Roof Trim Rhomb Railing...

Page 37: ...ice 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com The materials c...

Reviews: