![Backyard Products Heartland VALUE Series Assembly Manual Download Page 37](http://html1.mh-extra.com/html/backyard-products/heartland-value-series/heartland-value-series_assembly-manual_3359456037.webp)
ROOF PANELS
2" (5,1 cm)
PARTS REQUIRED:
x4
3/4"
GAUGE BLOCK
GAA
35
Two Nails
Two Nails
96"
(121,9 cm)
3/4"
(1,9 cm)
Gauge
Block
Fig. B
Flush at peak
Fig. A
Flush at peak
Fig. C
1/2"
(1,3 cm)
Gauge
Block
Fig. D
7/16 x 48 x 96"
(1,1 x 121,9 x 243,8 cm)
x1
Move to the opposite end. Using the edge of the panel as a lever, move the
panel side-to-side until the top corner is flush to the peak
(Fig. C)
and there
is a 1/2" measurement to the gable trim
(Fig. D)
.
If necessary, move the rafter to obtain the 1/2" measurement.
Secure panel using (2) 2" nails in the corners.
2
You must square the roof by attaching (1) panel first. You will use the panels’ long edge as a lever to bring your roof
into square. Commonly known as “racking”.
Roof panels may cause serious injury until securely fastened.
Place a
47-7/8 x 48"
with a 3/4" measurement on the first
rafter from back wall
(Fig A)
and the panel flush at the peak
(Fig. B)
.
Secure panel using (2) 2" nails in the corners.
1
BEGIN
Note: all roof panels need to be installed with the rough side up (painted grid lines).