- 19 -
Installation manual
M-WRG-II M
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
7
Tools and equipment required
— Permanently elastic sealant, solvent-free if applied to polystyrene
— Sealing tape, 30 mm wide, e.g. Coroplast
— Sealing tape for bonding the wall box to the vapour barrier, e.g. Rissan
®
from SIGA
—
If necessary, wedges for fixing the wall box, 8x
alternatively use inflatable air cushions, 4x, e.g. Amo-Bag from Würth,
part no. 07156780
—
If necessary, wedges for fixing the filler piece, 4x
alternatively use inflatable air cushions, 2x, e.g. Amo-Bag from Würth,
part no. 07156780
— Adhesive tape
—
Perforated tape for fixing flat ductwork or flexible pipes
—
Expanding foam with abP (national technical test certificate of the DIBt) approval
(“exact gap” foam is recommended)
— Saw for cutting the ventilation pipes to length
— Saw for cutting the channels in the frame construction
— Styrofoam saw
— Spirit level
8
General installation instructions
NOTICE
— The unit must be installed in accordance with the generally acknowledged rules of
technology.
— Connections with adjacent components must be formed to absorb movements
between the contact surfaces.
—
Seal any connections that are exposed to driving rain with tapes, profiles or sealants
such that they offer sufficient protection against the expected conditions.
WARNING
Follow the relevant accident prevention regulations
►
Follow the accident prevention regulations when setting up the installation location.
►
Protect the outside area against falling parts.