InfiniBand Switch Platform Hardware User Manual
Mellanox Technologies
18
1.6.1.2 Installation and Cable Management Kit Parts
Parts for installing the shelf
Parts for installing the chassis
Parts for installing the filler panel
Parts for installing the cable manager
You will need 10 U of space in the rack. Nine U for the chassis and one U for the shelf.
Figure 1: Shelf Installation Kit Parts
• 1 shelf
• 8 M6 bolts for the caged nuts
• 4 caged nuts
• 2 Shelf rail slides
• 4 lock washers
• 2 long 2 hole flat washers
• 2 chassis rail slides
• 4 handles
• 8 M-5 pan head bolts
• 8 allen head screws
• 2 flat 4 hole metal spacers
• 1 allen wrench
• 8 lock washers
• 4 lock nuts for handles (These nuts are not to be used)
• 8 caged nuts for the faceplate
• 8 M6 bolts for the caged nuts, 8 for the faceplate
• 1 Bottom filler panel
• 2 M6 bolts
• 2 caged nuts M6
• 1 RH cable holder
• 1 LH cable holder
• 12 caged nuts M6
• 12 M6 bolts
• 6 cable holder shelves
Shelf
Rail
Rail Slide
Angled
Bracket
M6 X 12 bolts, caged nuts and
split lock washers
M6 X 16