InfiniBand Switch Platform Hardware User Manual
Mellanox Technologies
17
This chassis can be installed in standard 19” racks that have between 65cm and 80cm
between the vertical supports of the rack. Make sure that a fully populated rack including
cables will have sufficient air flow for cooling.
1.6.1
ESD Connection
Before starting any procedure on the IS5200 switch system:
1. Put an ESD prevention wrist strap on your wrist, and make sure there is good contact
between your body and the strap.
2. Plug the other end of the wrist strap to a valid ground. Make sure that this is a tight
fit.
1.6.1.1
Installation Procedure
Requirements
You will need:
Choose a rack which is able to support the mechanical and environmental characteris-
tics of a fully populated switch chassis.
Mellanox recommends a rack that is at least 80 cm long.
• #2 phillips screwdriver
• #3 phillips screwdriver
• a grounding lug
• ground wire to properly ground the chassis
The installation will be much easier with a power screwdriver.
It is recommended to use AWG6 or 4mm diameter wire for grounding purposes.
It is recommended to have at least two people for the duration of the installation proce-
dure. Use a mechanical lift to raise this chassis. If not, use enough manpower to ensure
the safety and wellbeing of all of the people involved in the installation.