MELTER OPERATION
4-25
MA-5068-E
MACRO 200 INSTRUCTIONS MANUAL
retentions found on the circuit (the length and diameter of the hose, elbows
in the connectors, the diameters of the nozzle outputs, etc.) and the adhesive
itself (its viscosity).
For safety reasons, this pressure must be discharged when the circuit exceeds
the operating value (normally with a closed circuit and the pump activated),
which makes the use of a discharge valve or a by-pass valve necessary.
This valve may be a manual adjustment valve, using a threaded screw, or upon
request, with pneumatic control, using a pressure regulator and a pressure
gauge. In the latter case, the adhesive circuit pressure has a 15:1 ratio to the
pressure displayed on the pressure gauge.
Manual valve control
To adjust the pressure with this valve model (in an approximate manner),
follow these steps:
1. Screw the spindle in clockwise, as far as possible. In this position, the
maximum pressure is 80 kg/cm
2
.
2. Gradually loosen by turning counterclockwise until reaching the
desired pressure. Each millimeter that the spindle sticks out
represents a reduction of approximately 9 kg/cm
2
.
Pneumatic valve control
To adjust the pressure with this valve model, follow these steps:
1. Unlock the pressure regulator control by pulling on it gently.
2. Turn it clockwise to increase the pressure. This will be seen reflected
on the pressure gauge located next to it.
Warning
: Do not exceed 6 bar of pressure. This corresponds to 80 kg/cm
2
on
the hydraulic circuit.
Turning off the melting equipment
If it is necessary to disconnect the melting equipment:
1. Turn off each pump control card installed in the unit.
2. Turn off the machine switch on the door of the electrical cabinet.
3. Reduce the pressure to 0 using by-pass valve in the case of pneumatic
control.
Summary of Contents for MACRO 200
Page 1: ...ADHESIVE MELTER MACRO 200 INSTRUCTIONS MANUAL MA 5068 ENG 221220 GLUING SOLUTIONS ...
Page 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Page 32: ...FOCKE MELER GLUING SOLUTIONS INSTALLATION 3 12 This page is intentionally left blank ...
Page 66: ...FOCKE MELER GLUING SOLUTIONS 5 8 MAINTENANCE This page is intentionally left blank ...
Page 71: ...ELECTRICAL DRAWINGS 7 1 MA 5068 ENG MACRO 200 INSTRUCTIONS MANUAL 7 ELECTRICAL DRAWINGS ...
Page 72: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Page 74: ...FOCKE MELER GLUING SOLUTIONS 8 2 PNEUMATIC DIAGRAM This page is intentionally left blank ...
Page 82: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST This page is intentionally left blank ...