Operating Instructions Tray washing machine Modell BTA 160 / 240
Datei:BA_BTA_9668415_EN_2009-10.docx
9668415
41/48
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
Service step
Maintenance
Cleaning
works
Daily
At least once
quarterly
At least once
or twice a
year
but
Every
1000 h
At least once
yearly
but
Every
2000 h
PLEASE NOTE:
Whenever any electrical components are disconnected and reconnected,
replaced or repaired, a safety test must be conducted, at least on these
components!!!
2. Transport
Check the bi-cords for sufficient tension
Check conveyor split pins for wear or damage and that they are all present
Check the bi-cords for even running
3. Wash pumps
Check pump motor
Check motor for exterior damage
Check current consumption (IN see wiring diagram)
Check motor for quiet running (bearing damage)
Check ventilation grid for cleanliness
Check wash pump
Check sliding ring seal for watertightness (external visual check)
Replace sliding ring seal
approximately
every 2 years
every 3000 h
Check pump impeller for damage
Check pump housing for damage
Pump screen (suction side)
Check pump screen condition
Thoroughly clean inside of pump screen
Clean outside of pump screen
4. Wash systems
Check ascending pipe for watertightness
Pump / ascending pipe connection
Ascending pipe
Ascending pipe / wash system connection
Wash system seating
Check wash system
Check wash system for damage
Check nozzles for cleanliness
Check that the correct number of wash pipe end caps is present
Summary of Contents for BTA160
Page 48: ......