Operating Instructions Tray washing machine Modell BTA 160 / 240
Datei:BA_BTA_9668415_EN_2009-10.docx
9668415
24/48
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
7.11 Exhaust air connection of the appliance
Air control equipment must be designed to comply with local regulations (for example, in
Germany VDI 2052) and must in all cases be water-tight and corrosion resistant.
The values indicated for exhaust air temperature and humidity can increase under certain
operating conditions (e.g. standby).
The discharge air connection must be connected into the building’s exhaust air system as
in the installation plan.
Important !
The exhaust air connection must be made in such a way that the
parts containing water are not damaged in frosty weather.
If this is not possible, frost protection must be installed.
The hot, moist air from the machine must be removed from the washing-up kitchen. In
order to achieve efficient extraction, you must ensure that the overpressure on the
machine ducts or the negative pressure of the building is adequate.
7.12 Installation and connection of dosing units
When operating the machine it is necessary to use an industrial detergent and rinse
agent. You may only use detergents and rinse agents approved by the relevant authority
and which are also suitable for dish-washing appliances. The safety instructions relating
to their handling, dosing, storing and use must be particularly observed.
The dosing of the detergent and rinse agent should be done by a suitable piece of
equipment; the relevant regulations must be observed when installing such equipment.
Under no circumstances must detergent or rinse agent be allowed to enter the water
mains.
Your chemical supplier knows all the relevant regulations and the injection points
favoured by Meiko.
A mixing chamber has been provided for the rinse agent connection.
This is to be found
in the clean water inlet for rinse water downstream from the boiler.
The connection for the rinse agent supplier is provided in this mixing
chamber.
The thread for the connection is R 1/8”.
Summary of Contents for BTA160
Page 48: ......