How to Perform a Test
AVTMST16 Rev 1 May 2016
41
Completing the Operation
After the fault location procedure has been finished switch off the system by
pressing the “ON / OFF” button
.
The test object is to be grounded and shorted. Afterwards, the unit can be
disconnected from the test object in accordance with the safety instructions
below:
F
WARNING
Follow the five safety rules described on page 3.
Even if proper disconnection and discharging has taken
place, system components which have been under
voltage must only be touched, if they have been visibly
shorted and grounded before hand.
Do not undo and or remove grounding and shorting
measures until the time when the test object is put into
operation again.
Summary of Contents for SMART THUMP ST16
Page 2: ...M ...
Page 3: ...Portable Fault Locating System SMART THUMP ST16 User Manual ...
Page 6: ...M M ...
Page 10: ...M AVTMST16 Rev 1 May 2016 iv M ...
Page 46: ...M AVTMST16 Rev 1 May 2016 36 M ...
Page 52: ...M AVTMST16 Rev 1 May 2016 42 M ...
Page 56: ...M AVTMST16 Rev 1 May 2016 46 ...
Page 58: ...M AVTMST16 Rev 1 May 2016 48 M ...