
PIB-05
18 Feb 2015
PRODUCT INFORMATION BULLETIN
Suction Loading Station
Contents
1-1
DESCRIPTION
This document outlines the operation procedures,
commissioning, schedule of inspection and
maintenance, and support parts for the B4Z Suction
Loading Station. If you have any questions, concerns,
or issues regarding this system, contact Mega
Product Support at US Toll free: 1-800-345-8889 or
Direct: 1-505-345-2661.
OPERATIONS
SUCTION LOAD STATION WITH B4Z PUMP
1. Place vehicle as close to the water source as
possible.
2. Secure the vehicle by applying all parking brakes,
setting wheel chocks, and making the unit safe
for operation.
3. Remove suction hose from storage tubes and
assemble.
Ensure that all gaskets on the coupling joints are
present, in good condition, clean, and free from
distortion and damage. Presence of dirt and
debris on the gasket or coupling will decrease or
prevent pump priming or loading by allowing air
leakage.
4. Suction Hoses – Immerse in pond or water
supply.
The suction loading pump has a maximum
vertical lift capability of 8-10 feet. Attempting to
pump water into the tank from a reservoir that is
more than 8-10 feet below the pump station will
result in reduced suction loading performance.
5. Ensure water pump and suction hoses are full of
water before operating pump.
Operating the water pump in a dry sump will
result in shaft seal damage.
6. Submerge hose end with the foot valve into the
water source.
The removal/absence of foot valve will not allow
pump to be or stay primed and will reduce
performance of the pump. Ensure that it is
installed on the water source end of the pump
and not submerged in mud or silt.
7. Connect assembled suction hose to suction load
pump ensuring all connections are air tight and
secure.
Typical Inlet Foot Valve (Check Valve)
STEPS CONTINUE ON
NEXT PAGE
Description.........................................................................1-1
Operations..........................................................................1-1
Troubleshooting...............................................................1-3
Installation..........................................................................1-4
Water Pump Tuning........................................................ 1-11
Scheduled Maintenance Inspections....................... 1-13
Recommended Support Parts .................................... 1-14
Illustrated Parts Breakdown......................................... 1-15