
PIB-05
18 Feb 2015
PRODUCT INFORMATION BULLETIN
Suction Loading Station
1-6
12. Tac weld discharge tube elbow assembly in place to rear tank bulkhead.
13. Assemble 2 piece storage tubes and weld out. Storage tubes were cut for shipping purposes. a. Assemble
and align for straightness, prepare tube sections for welding, weld sleeve to inserted tube section.
14. Mount storage tube brackets on the sump assembly (048855-01) and pump station (048855-02)
15. Test fit storage tubes on storage tube brackets. Check for fit and alignment.
16. Position storage tubes on brackets and weld out. Reference drawing 048862 for location dimensions.
17. Once satisfied with fit-up of the entire station, weld out.
18. Position and tighten Dresser coupling on suction loading station discharge pipe.
19. Position and weld hydraulic return manifold mounting plate to bottom skin of tank on the right side as
referenced to on drawing 048855 sheet 1 of 2, item 2.
20. Prepare recently welded areas for prime and paint.
21. Prime and paint newly welded areas.