
PIB-05
18 Feb 2015
PRODUCT INFORMATION BULLETIN
Suction Loading Station
1-12
8. Once specified RPM is obtained, tighten flow
control jam nut.
9. Follow normal After Operations procedures (In
the “Operations” section) to shut down the
Suction Loading Station.
10. Cab Control Pump Switch - OFF.
Engaging/disengaging the water pump above
LOW IDLE will result in water pump component
damage and reduced service life.
11. Cab Control SYSTEM/POWER Switch – OFF.
12. Shutdown vehicle.
13. Remove photo tachometer, hydraulic gauges,
and water pressure gauge.