![MB 700 H Series Operation Manual Download Page 52](http://html1.mh-extra.com/html/mb/700-h-series/700-h-series_operation-manual_1752089052.webp)
52
5.6
Solar Panel Offset Calibration
This operation can be done by only “Maint’ user.
This operation calibrates parameters of soiled panel with clean panel. The operation
should be done under following conditions only.
i)
Clear sunny day with no clouds.
ii)
At solar noon.
iii)
Solar irradiation should be more than 0.8 sun.
Refer to the screen shown in figure 5.6 below.
Figure-5.6: Panel offset calibration
Select “Calibration Start’ in row ‘Panel Offset Calibration’.
Panel offset calibration will be done automatically and will be over in about 30
seconds.
Select “Calibration Stop’ in row ‘Panel Offset Calibration’ and logout.
Summary of Contents for 700 H Series
Page 8: ...8 M Soiling station with modem H Soiling station with high wattage solar panel...
Page 19: ...19...
Page 37: ...37...