Contents
V
4.5
Securing the axle assemblies ..................................................................... 27
4.6
Securing the installation adapters .............................................................. 27
4.7
Connecting the cables to the lifting gear .................................................... 28
4.7.1
Installing and connecting the service switch .................................... 28
4.7.3
Installing and connecting the control panel ..................................... 29
4.7.4
Connecting the handheld control (optional) ..................................... 33
4.7.5
Mounting the bracket for the handheld control (optional) ................ 33
4.7.6
Connecting the cables (front of vehicle) .......................................... 33
4.8
Unpacking the platform .............................................................................. 36
4.9
Raising the platform ................................................................................... 36
4.10
Installing the platform ................................................................................. 37
4.11
Mounting the platform lock on the closing arm ........................................... 41
4.12
Mounting the ground rollers ........................................................................ 42
4.13
Installing supports (vehicle-dependent) ...................................................... 43
4.14
Connecting the platform to the electrical system ........................................ 43
4.14.1
Connecting the platform cable to the electrical system ................... 43
4.14.2
Connecting the license plate light .................................................... 44
4.15
Mounting the license plate holder ............................................................... 45
4.16
Mounting the bridge plates (20 909 431) .................................................... 45
4.17
Mounting the warning flags ........................................................................ 45
4.18
Affixing the danger notice sticker ............................................................... 48
5
Adjusting the liftgate
....................................................................................... 49
5.1
Setting the lift height to the vehicle floor level using the adjustable stop on
the axle assembly .............................................................................................. 49
5.2
Aligning the platform parallel to the vehicle floor ........................................ 49
5.3
Aligning the platform (foldover section) parallel to the vehicle floor ............ 50
5.4
Checking the stop on the foldover section of the platform .......................... 52
5.5
Setting the end stop for the closed platform ............................................... 53
5.6
Adjusting the stopper for fastening the platform ......................................... 55
5.7
Adjusting the support arm for the driving position using the Bowden cable 55
5.8
Programming the tilt sensor ....................................................................... 56
6
Testing the liftgate........................................................................................... 58
6.1
Function test ............................................................................................... 58
6.2
Testing the operating speed ....................................................................... 58
6.2.1
Vertical speed ................................................................................. 58
6.2.2
Closing and opening speed (90° to 10°) .......................................... 58
6.2.3
Tilting speed (10° to -10°)................................................................ 58
6.3
Load tests ................................................................................................... 59
6.3.1
Static test ........................................................................................ 59
6.3.2
Dynamic test ................................................................................... 59
6.3.3
Testing against lifting an overload ................................................... 59
6.3.4
Testing the safety devices ............................................................... 59
6.4
Explanation of diagnostic LED on the control unit ...................................... 60
6.4.1
Checking tilt sensors S1 and S2 in the platform .............................. 61
6.4.2
Checking pressure switch S4 .......................................................... 61
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...