Preparing for installation
17
No preparation according to ETMA Code A and Code B
Power cable
Insert the positive cable (25
mm² red) (“power unit cable”) for the power supply
into a length of slit corrugated tubing (see Fig. 19).
NOTICE
Do not yet connect the cables.
Route the positive cable
(red) and negative cable
(blue) to the terminals but
do not yet connect them
(see Fig. 20).
Legend:
Item 1
Positive cable (red)
Part No. 20 907 673
Item 2
Negative cable (blue)
Part No. 20 907 673
Item 3
Connector for cabin switch unit
Part No. 20 910 754
Fig. 19
Fig. 20
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...