Installation Supplement
11.
Run Purkey’s Direct Trail Charger Harness from the nose of the trailer to Center Liftgate
Cable Guide. Route Purkey’s Direct Trail Charger Harness in center Liftgate Cable Guide
towards Junction Box.
12.
Route into Junction Box through single hole cord grip shown below. Cut approximately 6”
off the jacketed portion of the four-wire harness. Crimp and heat-shrink ring terminals to
wires and connect as shown below. Tighten cord grip outer nut to compress and seal
grommet to harness.
•
Provide drip loop for all cables running into Junction Box.
YELLOW WIRE WITH #10 RING TO TERMINAL 1
ORANGE WIRE WITH #10 RING TO TERMINAL 2
BLACK WIRE WITH #10 RING TO TERMINAL 3
TRAIL CHARGER
HARNESS GROMMET
WHITE WIRE WITH 3/8” RING TO GROUND STUD