Page
2
of
36
M-21-08 REV.B
Installation Supplement
Installation Supplement
Substitution for STEP 3.1 in RA Installation Manual
Note: Main Control switch is pre-wired to Junction Box.
1.
Connect batteries as shown below to allow running of the liftgate for installation positioning
before welding to trailer cross-members.
2.
Install 150 A circuit breaker provided in Purkey’s Severe Service Charge Line kit in Liftgate
battery box as shown below.
INSTALL 150 A
CIRCUIT BREAKER
CONNECT 4 BATTERIES
AS SHOWN.
JUMPER CABLE
175 A CIRCUIT BREAKER
PRE-INSTALLED IN BAT. BOX
CONNECT JUMPER
CABLE TO B12V