Page
17
of
36
M-21-08 REV.B
Addendum A
12.
Route 3 wire gray cable from Solar Box through cord grip in the Junction Box.
•
Reinstall backing plate to Junction Box with four screws and spacers removed in step 5.
•
Crimp and heat shrink #10 ring terminals to wires and connect as shown below.
13.
Tighten cord grip outer nut to compress and seal grommets.
14.
Provide drip loop for all cables running into the Junction Box.
15.
Connect PV+ and PV- connectors in Solar Box to Charge Controller.
WALL SWITCH WIRES
HARNESS GROMMET
#1 BLACK WIRE TO
TERMINAL #1 (UP)
#2 BLACK WIRE TO
TERMINAL #2 (DOWN)
YELLOW/GREEN WIRE TO
TERMINAL #8 (ALL SW)
CONNECT PV+ AND PV- CABLES
TO CHARGE CONTROLLER