13.
Install wall switches, two outside and two inside, per customer specifications. Route all four
loomed Liftgate Wall Switches along cross members, through grommeted cross member
holes exiting at the center Liftgate Cable Guide. Secure switch cables to cross members as
shown. Route wall switch harnesses in center Cable Guide towards Junction Box.
NOTE: If MAX SOL Solar System is being installed, go to Addendum A (page 11)
for instructions on installing Solar Box and wall switch wiring. Continue with
step 14 if not installing MAX SOL Solar System.
14.
Route 4 wall switch cables into Junction Box through the lower four-hole cord grip as shown
below.
•
Reinstall backing plate to Junction Box with four screws and spacers removed in step 5.
•
Cut off the excess cable. Cut approximately 4” off the jacketed portion of the three-wire
harness. Crimp and heat shrink #10 ring terminals to wires and connect as shown
below.
•
Tighten cord grip outer nut to compress and seal grommets.
•
Provide drip loop for all cables running into Junction Box.
WALL SWITCH WIRES
HARNESS GROMMET
#1 BLACK WIRE TO
TERMINAL #1 (UP)
#2 BLACK WIRE TO
TERMINAL #2 (DOWN)
YELLOW/GREEN WIRE TO
TERMINAL #8 (ALL SW)
WALL SWITCH CABLES