Page
9
of
36
M-21-08 REV.B
Installation Supplement
15.
Rec12V cables to Liftgate battery and charge line that were disconnected in step 3.
•
Check each switch for proper operation. If the switch function does not match the
switch decal, swap #1 wire and #2 wire for that switch.
16.
Attach main switch bracket to trailer side rail as shown.
17.
Check all switches and lights for correct operation.
Main switch – All functions (UP, DOWN, IN, OUT) work properly.
Exterior wall switches - All functions work properly, and operation matches switch decal.
Interior wall switches - All functions work properly, and operation matches switch decal.
Overhead platform light turns on when the platform is extended.
Red light on trailer front driver side corner post turns on when the platform is extended.
Overhead platform light turns off when the platform is fully stored.
Red light on trailer front driver side corner post is off when the platform is fully stored.
Interior dome lights turn on.
18.
When all connections in Junction Box are complete and checked, spray terminal studs with a
conformal coating.
19.
Reinstall Junction Box Cover.
POSITION RING TERMINALS FOR WALL
SWITCH WIRES AS SHOWN BELOW.