7
Concrete Pad
Input Power
Conduit
Check local building
codes in your area for
depth of concrete
before installation.
6” Above Ground
Ground Level
Secure gate operator to concrete
pad with four (4) 1/2” x 3” (min)
sleeve anchors.
Arm MUST be installed level.
Concrete Depth Note:
The heavier the gate, the deeper the concrete
pad should be. At least
two feet
recommended for heavier gate.
installation
single Gate Operator
•
REQUIRED -
AC input power wire to the
GATE OPERATOR
.
•
OPENING
cycle protection device wires (photocells) to the
GATE OPERATOR
. See page 13.
•
CLOSING
cycle protection device wires (photocells) to the
GATE OPERATOR
. See page 13.
•
In-ground loop wires to the
GATE OPERATOR
. See page 14.
Conduit Guidelines and Suggestions
1/2
“Optional” Input Power Note:
24VDC low voltage power wires can be run
from a remote power supply (MAX Magic
Box) to power the gate operator if desired.
See page 10 for more information.
Support Bar:
See below
Illustration not to scale
The gate must be properly installed and work freely in both directions prior to the installation of the gate operator.
See “Gate Operator Position” on page 6 for operator position
.
Support Bar
A support bar should be installed at the gate bracket height across the
ENTIRE
gate to keep the gate pickets from bending.
YES
YES
NO
NO
Gate Bracket
Support Bar Too High & Not Long Enough
Support Bar