Repair
Comet Executive Gas
7-10
20.
Continue working down the length of the
roll applying the friction material quickly
after the cement is spread.
21.
After the roll is covered, wrap the other
end of the roll with masking tape.
22.
Go back to the drive side of the roll, remove
the masking tape and carefully unwind the
un-cemented portion of the material.
23. Using the same technique, apply the ce
-
ment and carefully rewind the material
onto the roll.
24. Secure the end with masking tape.
NOTE:
If any cement gets onto
the friction material surface, use a
piece of masking tape to lift if off.
25. Wait about 10 minutes for the glue to hard
-
en; then, trim the ends of the friction mate
-
rial so it is even with the edges of the roll.
26. Carefully remove the masking tape.
27.
Secure the friction material at each end of
the drive roll with several wraps of glass
filament tape. Tape from the top while
turning the roll in its normal rotational
28. Remove the temporary protective covering
and clean up the area.
29. Reinstall the drive chain on its sprocket
and adjust its tension; refer to
Tension Adjustment on page 7-23
.
30. Refasten the feed ribbons. Make sure the
ribbon end is below the rod and between
the feed ribbon guides. Stagger the posi
-
tions of the lacing clips to give the flatwork
a smooth flow.
31. Allow the cement to harden for about 2
hours before operating the unit.
32.
After the cement hardens, adjust ribbon
tension; refer to
.
Figure 7-6:
Guide tapes help keep flatwork from
wrapping around the compression roll.
Guide Tape Replacement
The guide tapes (Figure 7-6) keep flatwork
from sticking to and wrapping around the
compression roll. These tapes wear through at the
staples or break over time, requiring replacement.
NOTE:
Replace any missing or
broken guide tapes immediately.
Required Tools
Allen wrench: 5/32”
Masking tape
Stapler/staples
Utility knife
Wrenches: 9/16” (2)
Perform only when the unit is
RUNNING and COOL.
Use Extreme Caution.
1. Make sure sufficient replacement guide
tape is available.
2.
Turn power OFF at the main disconnect
switch.
3. Open both endframe doors.
TOC
INDEX
Summary of Contents for Comet Executive Exec-56-G
Page 1: ...INSTRUCTION MANUAL COMET EXECUTIVE Gas Heated Flatwork Ironer...
Page 42: ......
Page 58: ......
Page 80: ......
Page 164: ......
Page 166: ...SC 2 Motor Circuit 115V 1 Phase SC TOC INDEX TOC...
Page 168: ...SC 4 Motor Circuit 230V 1 Phase SC TOC INDEX TOC...
Page 170: ...SC 6 Motor Circuit 230V 3 Phase SC TOC INDEX TOC...
Page 172: ...SC 8 Motor Circuit 415V 3 Phase SC TOC INDEX TOC...
Page 174: ...SC 10 Motor Circuit 460V 3 Phase SC TOC INDEX TOC...
Page 176: ...SC 12 Main Electrical Panel 115V 1 Phase SC TOC INDEX TOC...
Page 178: ...SC 14 Main Electrical Panel 230V 1 Phase SC TOC INDEX TOC...
Page 180: ...SC 16 Main Electrical Panel 230V 3 Phase SC TOC INDEX TOC...
Page 182: ...SC 18 Main Electrical Panel 460V 3 Phase SC TOC INDEX TOC...
Page 184: ......
Page 185: ...TOC INDEX...
Page 186: ......
Page 187: ...TOC INDEX...
Page 188: ......
Page 189: ...TOC INDEX...
Page 190: ......
Page 192: ......
Page 194: ......
Page 196: ......
Page 197: ...304500 1a TOC INDEX MB TOC...
Page 198: ...TOC INDEX MB TOC...
Page 199: ...TOC INDEX MB TOC...
Page 200: ...TOC INDEX MB TOC...
Page 221: ...3045069 TOC INDEX MB TOC...
Page 222: ...TOC INDEX MB TOC...
Page 223: ...TOC INDEX MB TOC...
Page 224: ...TOC INDEX MB TOC...
Page 229: ...TOC INDEX MB TOC...
Page 230: ...TOC INDEX MB TOC...
Page 231: ...TOC INDEX MB TOC...
Page 232: ...TOC INDEX MB TOC...
Page 236: ......
Page 238: ......
Page 244: ......