SAFETY GUIDELINES
SAFETY GUIDELINES
WIRE SIZE
•
Consult a qualified electrician for proper wire size.
PRE-OPERATION: CHECK VOLTAGE AND PHASE
•
Before operating pump, check to make sure that the voltage and phase information
stamped on the pump’s identification plate matches the available power.
IDENTIFICATION PLATE
•
Note the numbers on the pump’s identification plate and record at the end of the manual
for future reference.
INSULATION TEST
•
Before the pump is put into service, an insulation (megger) test should be performed on it.
The ohm values as well as the volts and amps should be recorded.
PUMP-DOWN TEST
•
After the pump has been properly wired and lowered into the basin, sump, or lift station,
it is advisable to check the system by filling with liquid and allowing the pump to operate
through its pumping cycle. The time needed to empty the system, or pump down time,
should be recorded.
MAINTENANCE
•
As the motor is oil-filled no lubrication or other maintenance is required.
CAUTION!
• Risk of electric shock. Do not remove cord and/or strain relief. Do not connect conduit to pump.