Table of Contents
Page
Topic
Description
1
Model #
Model Number
Caution
Looking at UV Light
Shipping Description
UV Packaging
2
Piping Layout
Piping Layout
Specification Table
Unit Specifications
3
Pre-Treatment
Pre-treatment Discussed
Water Quality Table
Unit Location
Unit Set Up
4
MWC-EM Pressure Vessel
Pressure Vessel Installation
5
UV Sensor
Sensor Installation
6
Electrical
Electrical Requirements
MWC Meter Power Supply
Meter/Power Supply
Installation
7
Grounding
Grounding Instructions
8
Quartz and O’ring
Installing Quartz and O’ring
Germicidal Lamp
Installing Germicidal Lamp
MWC-EM Meter
Starting up MWC-EM Meter
9
Water Pressure Test
Filling Vessel with water
Disinfecting
Instructions for disinfecting
the Piping System
10
Final Check
Installation Final Check
Intensity Adjustment
Adjusting Intensity
11
Annual Maintenance
Germicidal Lamp, Quartz
Sleeve, Sensor Eye
Maintenance
Figure 2
Figure 2
12
Troubleshooting
Troubleshooting
13
Replacement Parts
Replacement Parts
14
Warranty
Warranty