Page 64
efficient heat producing Zero Clearance Fireplaces.
PARTS
Included with Kit:
1
Main Body Assembly
1
Faceplate Top Insulation
1
Zero Clearance Top Louver Assembly
INSTALLATION
GENERAL INFORMATION
This kit consists of factory built parts that require mini-
mal assembly to form the Zero Clearance box for the
G51 Gas Insert. The Zero Clearance box can then be
fixed into a framed combustible construction, and a
standard "B-vent" installed on the assembly for the
required venting. The insert can be installed later. The
faceplate will normally overlap on top of the finished wall.
You can convert the G51 Gas Insert model into highly
CLEARANCES TO COMBUSTIBLES
The clearances for the Zero Clearance Kit are 0" to combustibles (back, side and floor) but when planning your
installation review the clearances required (see below) after it is installed in the Zero Clearance Kit.
Clearances to Combustibles
Refer to fire installation manual for clearances.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.
The Zero Clearance Kit must be installed on a flat, solid, continuous surface (e.g. wood, metal, concrete). This
may be the floor, or raised up on a platform to enhance its visual impact.
Combustible Mantel Clearances
Refer to installation instructions on page 7 of the fire
fire manual for clearances.
Facing Requirements
The fireplace requires a non-combustible material
extending to the framing header and sides.