© Martin Engineering GmbH
29
M3289UK-01/17
Maintenance
6
Maintenance
6.1
Safety information
6.2
Weekly maintenance
1.
Shut off the power supplies of the conveyor belt and any
additional equipment and secure them against unauthorised
reactivation.
2.
Remove all material deposits from the cleaning elements and
the mainframe.
3.
Inspect whether all of the fastening parts are securely
tightened. Tighten any loose connections.
4.
Check the cleaner tension and re-tighten if necessary.
5.
Check the cleaning elements for wear, damage and missing
parts.
NOTE
Maintenance inspections must be performed at least once a week.
Shorter maintenance intervals may be required depending on the
operating conditions.
NOTE
Read this section completely before starting any kind of work.
WARNING! RISK OF INJURY!
Body parts and/or clothing may get caught and pulled in by
rotating parts or by the moving conveyor belt.
Shut off the power supply to the conveyor system and its
accessories and secure it against unauthorised reactivation before
performing any maintenance work.
Use warning signs!
NOTE
Check wear and adjustments once a month, adjust if necessary.
The cleaning elements must always make sufficient contact with
the conveyor belt.