MANUAL OPERATION
OPERATING THE PUMPS IN MANUAL MODE
:
Provide power to the circuit breakers on the DC Bus Distribution Panel .
1 .
Locate the DC Bus Distribution Pane, located in Engine Room Aft:
2 .
Switch the
a .
BILGE PUMP 1 - BILGE PUMP 5 circuit breakers ON .
Switch the
b .
DC MAIN BREAKER SALON PANEL circuit breaker ON .
On the DC Distribution Panel (Salon Aft):
3 .
Switch the
a .
PANEL MAIN circuit breaker ON .
Switch ON the
b .
BILGE PUMP RELAY 1 - 5 BILGE PUMP RELAY circuit breakers .
Press the
3 .
BILGE PUMP 1 - BILGE PUMP 5 switches, located at the upper and lower helm dash, to the UP position to activate
the bilge pumps . (See Preface for Helm Switch Illustrations)
cauTiON
TURN OFF THE bILGE PUMP WHEN THE WATER DECREASES TO A LEVEL THAT PUMP CAN NO LONGER OPERATE.
CAUTION IS ONLY NECESSARY IN MANUAL MODE. ALLOWING THE PUMP TO OPERATE WITHOUT WATER CAN DAMAGE
THE PUMP.
A Tip From Marquis!
A small amount of water always collects in your yachts’s bilge. The water is usually not enough to activate the automatic
switch on the bilge pump. while underway, use the helm switches to manually turn the bilge pumps on, and let the
pumps run for 30 seconds to one minute. when your yacht is on plane, water in the bilge flows to the stern, where the
aft bilge pump is located. The amidships bilge pumps are near the lowest point in the hull.
HULL DRAIN
One hull drain is equipped on the yacht . The drain allows water to drain from the bilges while the yacht is in dry storage . The yacht
and cradle should be positioned to allow water to flow toward the hull drain .
The drain is located in the transom in the deepest POR-
Tion of the hull’s “V .”
The hull drain will drain water only from the bilge area aft of the forward engine bulkhead . If there is a collection of water forward of the
engine room bulkhead, it must be pumped out .
cauTiON
SECURELY TIGHTEN THE DRAIN PLUG INTO THE HULL DRAIN bEFORE LAUNCHING.
A Tip From Marquis!
coat the threads of the hull drain plug with waterproof grease before you install the plug into the hull drain fitting. This
makes it easier to remove the plug at a later date.
g
raY
w
ater
s
Ystem
Yachts equipped with a Gray Water System are designed to have the sinks and shower drain into the Sump, water drainage is
pumped to the Gray Water tank . Once the gray water tank is full, the tank can be emptied at dock side with the procedure described
on the next page, titled:
Emptying The Waste/Gray Water Tank
.
The gray water tank is comprised of two separate tanks connected by a hose . Gravity forces the gray water from one tank to the other
7027 •A2 07/11
57
i
nTernal
s
YsTem
s
eCTion
4
Summary of Contents for 720 FLY
Page 1: ...HIN CDR__________________ 2012 Version 1 Marquis 720 FL Y Owner s Guide...
Page 2: ......
Page 4: ......
Page 6: ...Table of Contents 7027 A2 07 11 Lower Helm Components...
Page 7: ...Preface 7027 A2 07 11 i Bridge Helm Controls...
Page 10: ...Preface iv 7027 A2 07 11 PAGE INTENTIONALLY LEFT BLANK...
Page 41: ...7027 A2 07 11 29 DC Electrical System Section 2...
Page 42: ...30 7027 A2 07 11 DC Electrical System Section 2 PAGE INTENTIONALLY LEFT BLANK...
Page 56: ...PAGE INTENTIONALLY LEFT BLANK 7027 A2 07 11 44 AC Electrical System Section 3...
Page 59: ...Air conditioning system Stateroom deck 7027 A2 07 11 47 Internal System Section 4...
Page 62: ...Internal water system 50 7027 A2 07 11 Internal System Section 4...
Page 86: ...74 7027 A2 07 11 Propulsion Section 5 PAGE INTENTIONALLY LEFT BLANK...
Page 120: ...108 7027 A2 07 11 Warranty and Parts Section 9 Thru Hull Fittings...
Page 121: ...7027 A2 07 11 109 Warranty and Parts Section 9 Thru Hull Fittings...
Page 122: ...110 7027 A2 07 11 Warranty and Parts Section 9 Bill of Materials...
Page 123: ...7027 A2 07 11 111 Warranty and Parts Section 9 Marquis Limited Warranty...