![Maritime Geothermal TF-45 Installation And Service Manual Download Page 2](http://html.mh-extra.com/html/maritime-geothermal/tf-45/tf-45_installation-and-service-manual_1727434002.webp)
Page 2
001223MAN-05
1-Jul-2017
WARNING:
Ensure all access panels are in place and properly secured before applying power to the unit.
Failure to do so may cause electrical shock.
WARNING:
Before performing service or maintenance on the heat pump system, ensure all power sources
are DISCONNECTED. Electrical shock can cause serious personal injury or death.
WARNING:
Heat pump systems contain refrigerant under high pressure and as such can be hazardous to
work on. Only qualified service personnel should install, repair, or service the heat pump.
CAUTION:
Safety glasses and work gloves should be worn at all times whenever a heat pump is serviced.
A fire extinguisher and proper ventilation should be present whenever brazing is performed.
CAUTION:
Venting refrigerant to atmosphere is illegal. A proper refrigerant recovery system must be
employed whenever repairs require removal of refrigerant from the heat pump.
SAFETY PRECAUTIONS
Model Nomenclature
Series:
TF = Active Cooling Liquid to Air &
Liquid To Water
Nominal Size:
45 = 3 Ton
55 = 4 Ton
65 = 5 Ton
75 = 6 Ton
80 = 6.5 Ton
Functions:
H = Heating
AC = Active Cooling
W = Domestic Hot Water
Refrigerant:
P = R410a
Voltage Code:
1 = 208/230-1-60
2 = 208-3-60
3 = 265/277-1-60
4 = 460-3-60
6 = 220-1-50
7 = 380-3-50
Compressor:
S = 1 Stage Scroll
T = 2 Stage Scroll
Indoor Loop Exchanger:
C = Copper
Y = CuNi coil & piping
Z = CuNi coil only
Air Coil:
S = Standard
(non-coated)
Fan Type:
D = Direct Drive
Fan Motor:
E = ECM (Variable Speed)
Fan Return Orientation:
L = Left Return
R = Right Return
Fan Outlet Orientation:
F = Field Configurable
(top or side)
Revision:
01, 02 etc.
TF—65—HACW—P—1T—CC—SDERF—xx
Outdoor Loop Exchanger:
C = Copper
Y = CuNi coil & piping
Z = CuNi coil only
Summary of Contents for TF-45
Page 12: ...Page 12 001223MAN 05 1 Jul 2017 ...
Page 13: ...1 Jul 2017 Page 13 001223MAN 05 ...
Page 14: ...Page 14 001223MAN 05 1 Jul 2017 ...
Page 15: ...1 Jul 2017 Page 15 001223MAN 05 ...
Page 16: ...Page 16 001223MAN 05 1 Jul 2017 ...
Page 19: ...1 Jul 2017 Page 19 001223MAN 05 ...
Page 20: ...Page 20 001223MAN 05 1 Jul 2017 ...
Page 23: ...1 Jul 2017 Page 23 001223MAN 05 ...
Page 24: ...Page 24 001223MAN 05 1 Jul 2017 ...
Page 25: ...1 Jul 2017 Page 25 001223MAN 05 ...
Page 26: ...Page 26 001223MAN 05 1 Jul 2017 ...
Page 27: ...1 Jul 2017 Page 27 001223MAN 05 ...
Page 30: ...Page 30 001223MAN 05 1 Jul 2017 ...
Page 31: ...1 Jul 2017 Page 31 001223MAN 05 ...
Page 32: ...Page 32 001223MAN 05 1 Jul 2017 ...
Page 33: ...1 Jul 2017 Page 33 001223MAN 05 ...
Page 34: ...Page 34 001223MAN 05 1 Jul 2017 ...
Page 38: ...Page 38 001223MAN 05 1 Jul 2017 ...
Page 39: ...1 Jul 2017 Page 39 001223MAN 05 ...
Page 40: ...Page 40 001223MAN 05 1 Jul 2017 ...
Page 74: ...Page 74 001223MAN 05 1 Jul 2017 Wiring Diagram 208 230 1 60 ...
Page 75: ...1 Jul 2017 Page 75 001223MAN 05 Electrical Box Layout 208 230 1 60 ...
Page 76: ...Page 76 001223MAN 05 1 Jul 2017 Wiring Diagram 208 3 60 ...
Page 77: ...1 Jul 2017 Page 77 001223MAN 05 Electrical Box Layout 208 3 60 ...
Page 78: ...Page 78 001223MAN 05 1 Jul 2017 Wiring Diagram 460 3 60 ...
Page 79: ...1 Jul 2017 Page 79 001223MAN 05 Electrical Box Layout 460 3 60 ...
Page 80: ...Page 80 001223MAN 05 1 Jul 2017 Wiring Diagram 220 1 50 ...
Page 81: ...1 Jul 2017 Page 81 001223MAN 05 Electrical Box Layout 220 1 50 ...
Page 82: ...Page 82 001223MAN 05 1 Jul 2017 ...
Page 83: ...1 Jul 2017 Page 83 001223MAN 05 ...
Page 84: ...Page 84 001223MAN 05 1 Jul 2017 ...
Page 85: ...1 Jul 2017 Page 85 001223MAN 05 Dimensions TF 45 Left Return ...
Page 86: ...Page 86 001223MAN 05 1 Jul 2017 Dimensions TF 45 Right Return ...
Page 87: ...1 Jul 2017 Page 87 001223MAN 05 Dimensions TF 55 65 75 80 Left Return ...
Page 88: ...Page 88 001223MAN 05 1 Jul 2017 Dimensions TF 55 65 75 80 Right Return ...