2A-26 - ELECTRICAL
90-824052R3 JUNE 2002
Ignition Coil Installation
1. Place coil in coil cover and install to engine with
4 screws and nuts.
a
d
c
b
51843
a - Ground Wire [Between (–) Coil Terminal and Engine
Ground]
b - Ignition Coil
c - (+) Coil Terminal
d - Coil Cover
2. Reconnect switch box wire to (+) terminal of coil
and black ground wire to (–) terminal.
3. Pull the boot back and insert spark plug lead into
coil. Caution must be taken to ensure a complete
connection of lead into coil. Form a water tight
seal between coil tower and spark plug lead
using Quicksilver Insulating Compound
(92-41669). Assemble boot over coil terminal.
SWITCH BOX(ES) REMOVAL AND
INSTALLATION
Switch Box(es) Removal
1. Remove 2 screws and lift switch boxes from
engine. (Retain round metal spacers.)
b
a
51844
a - Screws
b - Spacers
2. Disconnect wires from switch boxes.
Switch Box(es) Installation
1. Reconnect wires to proper terminals of switch
boxes. Secure a ground lead (if equipped) to
each switch box using a screw. Refer to wiring
diagram, following in this section. Wires with
yellow identification sleeve must be connected to
outer switch box. Outer switch box fires cylinders
No. 2, 4 and 6.
2. Install switch boxes to engine with 2 screws and
2 round metal spacers, as shown. Make sure that
both switch boxes are grounded to engine thru
mounting screws, spacers, and ground leads (if
equipped).
Summary of Contents for 105/140 JET
Page 5: ...1 A IMPORTANT INFORMATION SPECIFICATIONS...
Page 14: ...1 B IMPORTANT INFORMATION MAINTENANCE...
Page 25: ...C 1 IMPORTANT INFORMATION GENERAL INFORMATION...
Page 34: ...D 1 B A D C IMPORTANT INFORMATION OUTBOARD MOTOR INSTALLATION...
Page 50: ...A 2 ELECTRICAL IGNITION SYSTEM...
Page 79: ...2A 28 ELECTRICAL 90 824052R3 JUNE 2002 SPARK PLUG WIRE ROUTING HIGH PERFORMANCE OUTBOARDS...
Page 80: ...B 2 51797 ELECTRICAL BATTERY CHARGING SYSTEM AND STARTING SYSTEM...
Page 101: ...C 2 ELECTRICAL TIMING SYNCHRONIZING ADJUSTING...
Page 117: ...D 2 ELECTRICAL WIRING...
Page 133: ...90 824052R3 JUNE 2002 ELECTRICAL 2D 15 Notes...
Page 149: ...A 3 FUEL SYSTEMS FUEL PUMP...
Page 159: ...B 3 54350 FUEL SYSTEMS CARBURETORS...
Page 161: ...90 824052R3 JUNE 2002 FUEL SYSTEMS 3B 1 Notes...
Page 206: ...C 3 FUEL SYSTEMS FUEL INJECTION SN 0G303045 AND BELOW...
Page 213: ...1 2 3 4 5 6 7 8 3C 6 FUEL SYSTEMS 90 824052R3 JUNE 2002 Fuel Management System...
Page 272: ...D 3 55173 FUEL SYSTEMS FUEL INJECTION SN 0G303046 AND ABOVE...
Page 344: ...E 3 FUEL SYSTEMS OIL INJECTION...
Page 370: ...4 51804 A POWERHEAD...
Page 418: ...90 824052R3 JUNE 2002 POWERHEAD 4A 47 Notes...
Page 429: ...4 51804 B POWERHEAD COOLING...
Page 434: ...4B 4 POWERHEAD 90 824052R3 JUNE 2002 Notes...
Page 436: ...90 824052R3 JUNE 2002 4B 6 POWERHEAD...
Page 441: ...A 5 MID SECTION CLAMP SWIVEL BRACKET AND DRIVESHAFT HOUSING...
Page 443: ...90 824052R3 JUNE 2002 MID SECTION 5A 1 Notes...
Page 457: ...B 5 MID SECTION POWER TRIM SQUARE MOTOR AND ROUND MOTOR DESIGN...
Page 495: ...A 6 LOWER UNIT E Z SHIFT GEAR HOUSING STANDARD ROTATION...
Page 554: ......
Page 555: ...B 6 LOWER UNIT COUNTER ROTATING LEFT HAND GEAR CASE...
Page 616: ...C 6 LOWER UNIT MERCURY XR6 MARINER MAGNUM III GEAR HOUSING...
Page 651: ...D 6 LOWER UNIT E Z SHIFT GEAR HOUSING NON RATCHETING STANDARD ROTATION STARTING S N 0G438000...
Page 657: ...90 824052R3 JUNE 2002 LOWER UNIT 6D 5 Notes...
Page 697: ...90 824052R3 JUNE 2002 LOWER UNIT 6E 5 Notes...
Page 740: ...6 F JET OUTBOARDS...
Page 742: ...90 824052R3 JUNE 2002 JET OUTBOARDS 6F 1 Notes...
Page 759: ...7 ATTACHMENTS CONTROL LINKAGE...