
1 - 16
- Place the load in a horizontal position (1) and lay it down on the pile (2)
while checking the correct positioning of the load (Fig. M).
- Free the forks by reversing the lift truck (3) (Fig. M). Then bring the forks
into the transport position.
TAKING UP A NON PALLETISED LOAD
- Tilt the carriage (1) forwards and move the lift truck forward (2) while
simultaneously crowding the carriage backwards to slip the forks under the
load (Fig. N). If necessary, wedge the load.
2
1
3
N
3
2
1
M
Summary of Contents for MSI 20 D
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 1 1 OPERATING AND SAFETY INSTRUCTIONS 1 OPERATING AND SAFETY INSTRUCTIONS...
Page 8: ...1 2...
Page 10: ...1 4...
Page 23: ...1 17...
Page 28: ...1 22...
Page 29: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Page 30: ...2 2...
Page 31: ...2 3...
Page 69: ...2 41 D 5...
Page 74: ...2 46...
Page 75: ...3 1 3 MAINTENANCE 3 MAINTENANCE...
Page 76: ...3 2...
Page 79: ...3 5...
Page 83: ...3 9...
Page 90: ...3 16 B9 4 B9 5 4 5...
Page 101: ...3 27 3 27...
Page 110: ...4 2...