1-15
I
NSTRUCTIONS
FOR
WELDING
AND
BLOW
TORCH
WORK
ON
THE
EXTERNAL
STRUCTURE
Ensure that there are no hydraulic or electrolyte leaks on the platform.
When welding, work in the opposite direction from the control console to avoid sparks damaging it .
- Any welding and cutting (blow torch) work from the basket on a building’s metallic structures requires the following precautions to be
taken:
A - W
ITH
ELECTRIC
WELDING
EQUIPMENT
- It is essential that the machine has a discharge braid connecting the platform’s chassis to the ground.
- It is also essential that the external structure to be welded is connected to the earth. If the above conditions are observed, the platform
can, in this case, be in contact with the structure or the elements to be welded without damaging the electronic components.
- The power supply to the welding equipment must be via an earthed socked and any extension required just also be earthed.
- In all cases, ensure that there are no electrical arcs in the basket or on the platform (contact between the brazing rod or the torch and the
welding equipment’s earth). To ensure this, at any time the welding equipment’s earth must not be positioned on the platform’s basket
but instead only as close as possible to the element to be welded.
- Switch off the welding equipment before disconnecting the earth clamp from the element or elements to be welded.
B - W
ITH
A
BLOW
TORCH
- Attach the blow torch’s bottles to the basket’s handrails.
- instructions for welding and blow torch work on the external structure
- Do not set the blow torch down on the lip of the basket while it is still operating or point it towards the control console or its power
cables.
647367
(01/03/2017)
100/120
SC-2
/ 140
SC
Summary of Contents for 100 SC-2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647367 100 SC 2 120 SC 2 140 SC...
Page 6: ...1 2 647367 01 03 2017 100 120 SC 2 140 SC...
Page 25: ...1 21 647367 01 03 2017 100 120 SC 2 140 SC...
Page 28: ...1 24 647367 01 03 2017 100 120 SC 2 140 SC...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647367 01 03 2017 100 120 SC 2 140 SC...
Page 36: ...2 2 647367 01 03 2017 100 120 SC 2 140 SC...
Page 39: ...2 5 647367 01 03 2017 100 120 SC 2 140 SC...
Page 41: ...2 7 647367 01 03 2017 100 120 SC 2 140 SC...
Page 45: ...2 11 647367 01 03 2017 100 120 SC 2 140 SC...
Page 47: ...2 13 DIAGRAM 100 SC 2 120 SC 2 140 SC 647367 01 03 2017 100 120 SC 2 140 SC...
Page 65: ...2 31 647367 01 03 2017 100 120 SC 2 140 SC...
Page 72: ...2 38 647367 01 03 2017 100 120 SC 2 140 SC...
Page 73: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647367 01 03 2017 100 120 SC 2 140 SC...
Page 74: ...3 2 647367 01 03 2017 100 120 SC 2 140 SC...