3-31
H3 - Platform
SLINGING
- Take note of the position of the platform’s centre of gravity for lifting it.
- Insert hooks in the anchoring points provided for this purpose.
- Lower the platform fully. Ensure that the extension, the controls and the bonnets are secured. Remove any elements not fixed onto the
machine.
- Determine the machine’s centre of gravity using the table and the illustration on this page.
- Attach the tying systems only to the specified lifting points on the machine.
- Adjust the whole system avoid damaging the machine and to keep it level.
Centre of gravity
Axis X
Axis Y
100
SC-2
108,1
cm
78,5
cm
120
SC-2
108,2
cm
79,8
cm
140
SC
98,6
cm
79
cm
Axe Y
Axe X
Axis Y
Axis X
647367
(01/03/2017)
100/120
SC-2
/ 140
SC
Summary of Contents for 100 SC-2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647367 100 SC 2 120 SC 2 140 SC...
Page 6: ...1 2 647367 01 03 2017 100 120 SC 2 140 SC...
Page 25: ...1 21 647367 01 03 2017 100 120 SC 2 140 SC...
Page 28: ...1 24 647367 01 03 2017 100 120 SC 2 140 SC...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647367 01 03 2017 100 120 SC 2 140 SC...
Page 36: ...2 2 647367 01 03 2017 100 120 SC 2 140 SC...
Page 39: ...2 5 647367 01 03 2017 100 120 SC 2 140 SC...
Page 41: ...2 7 647367 01 03 2017 100 120 SC 2 140 SC...
Page 45: ...2 11 647367 01 03 2017 100 120 SC 2 140 SC...
Page 47: ...2 13 DIAGRAM 100 SC 2 120 SC 2 140 SC 647367 01 03 2017 100 120 SC 2 140 SC...
Page 65: ...2 31 647367 01 03 2017 100 120 SC 2 140 SC...
Page 72: ...2 38 647367 01 03 2017 100 120 SC 2 140 SC...
Page 73: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647367 01 03 2017 100 120 SC 2 140 SC...
Page 74: ...3 2 647367 01 03 2017 100 120 SC 2 140 SC...