23
TPM 087/12
5.4.
Installation examples
Placement
Filling of space between damper and wall
Figure
In solid wall construction
mineral stone wool, surface is covered by
fire protection mastic and cement lime plate
17, 18
In solid ceiling construction
mineral stone wool, surface is covered by
fire protection mastic and cement lime plate
19, 20
In gypsum wall construction
mineral stone wool, surface is covered by
fire protection mastic and cement lime plate
21
On solid wall construction
-
22, 23
On solid ceiling construction
-
24, 25
Vertical duct installation
-
26
Horizontal duct installation
-
27
Tab. 5.4.1.
Statement of installations
5.4.1.
Installation in solid wall or ceiling construction of fire compartment
Fig. 17 Example of installation in solid wall construction of fire compartment - vertical blade axis position.
1
5
4
3
2
Cover of actuating mechanism
has to be removable after installation
Position:
1 Damper SEDM
2 Solid wall construction
3 Mineral stone wool, density 140 kg/m
4 Fire protection mastic, thickness 1 mm
5 Cement lime plate, thickness 15 mm,
density 870 kg/m
6 Hinges
6
3
Summary of Contents for SEDM
Page 1: ......