26
TPM 087/12
Fig. 23 Example of installation on solid wall construction of fire compartment - horizontal blade axis position.
5.4.3.
Installation on solid wall or ceiling construction of fire compartment
Fig. 22 Example of installation on solid wall construction of fire compartment. - vertical blade axis position.
Position:
1 Damper SEDM
2 Solid wall construction
3 Ceramic paper*
4 Hinges
2
4
3
1
* Ceramic paper is placed between damper and solid wall construction
Position:
1 Damper SEDM
2 Solid wall construction
3 Ceramic paper*
4 Hinges
2
4
3
1
* Ceramic paper is placed between damper and solid wall construction
Summary of Contents for SEDM
Page 1: ......