7
4.2 INSTALLATION OF Opera-GH OPERATOR
IMPORTANT NOTE
:
THIS OPERATOR MUST BE INSTALLED A MINIMUM OF 8 FT. (2.4 m) ABOVE FLOOR
.
To open the control box cover, loosen the screw at the base of the cover. If the cover cannot be fully opened,
the retaining arm may be used to hold the cover in other positions.
Figure 4
Control box cover opening
After installation, verify that there is no obstacle in the way when opening the control box cover. If so, it is
possible to remove the cover by unscrewing it from the box before putting the operator on the wall or hood
(see Figure 5).
Figure 5
Unscrewing control box
Retaining arm
Remove the
screw
Remove the
screw
Summary of Contents for Opera-GH
Page 18: ...18 6 Opera GH exploded view...
Page 29: ...29 7 10 Single phase ECB wiring diagram...
Page 30: ...30 7 11 3 Phase ECB wiring diagram...
Page 42: ...42 9 9 Single phase Hardwired wiring diagram...
Page 43: ...43 9 10 3 phase Hardwired wiring 10 3 phase Hardwired wiring diagram...
Page 45: ...45 NOTES...
Page 46: ...46 NOTES...
Page 47: ...47 NOTES...
Page 48: ...48 BOOK146 REV 1 2007 02 19...