Getting started
The first steps involve powering on the instrument and starting the software.
Before powering on the instrument, we recommend ensuring that the optical
windows are clean; see Chapter 8 for advice on cleaning the system.
'
N o t e
.
If in doubt about the optical cleanliness, check the live display of the
background measurement. This shows whether the optics are clean.
$
To power on the instrument:
.
Turn on the instrument at its power switch.
.
Turn on the computer at its power switch.
'
N o t e
.
For a continuous measurement of over 30 minutes, the instrument
requires 90 minutes to warm up to a completely stable state. This does
not affect other measurement types.
$
To start the Spraytec software:
.
Double-click on the Spraytec desktop icon. (If the icon is not available,
open the
Start menu
and select
Programs-Malvern Instru-
ments-Spraytec
to start the software.)
.
The logon screen shown below is displayed; type your user name and click
OK
. (If security is configured, it prompts for a password too. For supervi-
sors, Chapter 9 describes how to administer security and set up users and
groups.)
.
The software opens. If a measurement file was open in the previous ses-
sion, this reopens automatically. If this is the first use of the software the
Example results.smea
file is opened in the Measurement file window.
C H A P T E R 5
S
p
r
a
y
t
e
c
P a g e 5 . 2
M
A
N
0
3
6
8
Summary of Contents for Spraytec
Page 1: ...Spraytec User Manual Spraytec User Manual M A N 0 3 6 8 I s s u e 1 0 N o v 2 0 0 5...
Page 7: ...Part 1 Operator s guide Part 1 Operator s guide...
Page 8: ......
Page 9: ...Introduction to this manual Introduction to this manual C H A P T E R 1...
Page 10: ......
Page 16: ...C H A P T E R 1 S p r a y t e c Page 1 6 M A N 0 3 6 8...
Page 17: ...What is the Spraytec What is the Spraytec C H A P T E R 2...
Page 18: ......
Page 31: ...The Spraytec hardware The Spraytec hardware C H A P T E R 3...
Page 32: ......
Page 42: ...C H A P T E R 3 S p r a y t e c Page 3 10 M A N 0 3 6 8...
Page 43: ...The Spraytec software The Spraytec software C H A P T E R 4...
Page 44: ......
Page 63: ...Measurement tutorial Measurement tutorial C H A P T E R 5...
Page 64: ......
Page 99: ...Interpreting the results Interpreting the results C H A P T E R 6...
Page 100: ......
Page 125: ...Using measurement files Using measurement files C H A P T E R 7...
Page 126: ......
Page 133: ...Basic maintenance Basic maintenance C H A P T E R 8...
Page 134: ......
Page 139: ...Part 2 Supervisor s guide Part 2 Supervisor s guide...
Page 140: ......
Page 141: ...Security Security C H A P T E R 9...
Page 142: ......
Page 151: ...Advanced features Advanced features C H A P T E R 1 0...
Page 152: ......
Page 170: ...C H A P T E R 1 0 S p r a y t e c Page 10 18 M A N 0 3 6 8...
Page 171: ...SOP management SOP management C H A P T E R 1 1...
Page 172: ......
Page 175: ...Part 3 Appendices Part 3 Appendices...
Page 176: ......
Page 177: ...Health and Safety Health and Safety A P P E N D I X A...
Page 178: ......
Page 184: ...A P P E N D I X A S p r a y t e c Page A 6 M A N 0 3 6 8...
Page 185: ...Specification Specification A P P E N D I X B...
Page 186: ......
Page 191: ...Site requirements f r o m M A N 0 3 6 8 I s s u e 1 0 Site requirements A P P E N D I X C...
Page 200: ...A P P E N D I X D S p r a y t e c Page D 3 M A N 0 3 6 8...
Page 201: ...Installation Installation A P P E N D I X E...
Page 202: ......
Page 206: ...A P P E N D I X E S p r a y t e c Page E 4 M A N 0 3 6 8...
Page 207: ...Regulatory statements Regulatory statements A P P E N D I X F...
Page 208: ......
Page 213: ...Index Index...
Page 214: ......
Page 221: ......