8
MODEL CAPACITY EXPANSION TANK
25 MKK-S
25.000 kcal/h
50 lt
40 MKK-S
40.000 kcal/h
75 lt
60 MKK-S
60.000 kcal/h
100 lt
80 MKK-S
80.000 kcal/h
200 lt
100 MKK-S
100.000 kcal/h
250 lt
125 MKK-S
125.000 kcal/h
275 lt
150 MKK-S
150.000 kcal/h
300 lt
200 MKK-S
200.000 kcal/h
500 lt
250 MKK-S
250.000 kcal/h
600 lt
*
At first operation of the boiler, installation pipes should be cleaned up before the connection.
The most appropriate way is to flood water from one end of the pipes and to drain off at the
other side.
*C
irculation pump must be installed on boiler water return pipe.
*During installation,
there must be enough working space left for technical service
intervention, boiler control, and fuel feeding
*Valve connection should be made on boiler water flow and return lines.
*Chimney connections should be leakproof, same diameter pipes without any narrowing
sections should be used from the exit of boiler to the chimney hole.
*Grounding connections should be done, electricity connection of circulation pump should be
done correctly. Only technical services are authorized at all electricity related breakdowns.