background image

 

16 

 
                                                                    

 

 
 
 
 
                                                                      

 

 

 

7.2 WARNINGS FOR USE

 

 

Circulation pump will start running when the burning continues and boiler water temperature comes 
to  35°C. This prevents extra electric cunsumption and heats boiler immediately  so prevents  
damages from sweat of  steam. Prevents water that is not properly heated to the raditaors.                                                        

9

 

 

Boiler water temperature decreases when the fuel is finished and when it is  

30°C, circulation 

pump stops running. When the boiler water temperature decreases to  25°C all functions stops.

 

 

 

Fan automatically stops running when the boiler water temperature comes to set thermostat 
degree. Fan starts running when the boiler water decreases  5°C below set degree.

 

 

 

Running and stopping of circulation pump and fan can be monitored from flashing leds on digital 
indicator on control panel.

 

 

 

Circulation  pump  will  run  automatically    for  3  seconds  in  every  25  hours  unless  the    boiler  is 
unplugged. This prevents the failures on pump uring long periods when the boiler is not in use. 

 

 

CAUTION!!! 

If the electricity power goes off, the circulation pump will stop working so the 

high heat trapped in the boiler and it  will increase the boiler water to the boiling point. In this 
case you should do as following; 
1- Close the air inlet of the fan completely. 
2- DO NOT open the lids of the boiler. 
3- If there are by-pass valves installed in the system, open them.  
4- When the power comes back, return to your previous adjustments. Follow the steps to 
start combustion to start burning in the boiler.

 

 
 

 

                                                                            

 

 
 
 

 

 
 

Summary of Contents for 25 MKK-S

Page 1: ...1...

Page 2: ...TION AND WATER FLOOD 9 BOILER INSTALLATION SCHEMA 10 4 2 AIR CONNECTION 11 4 3 CHIMNEY 11 CHIMNEY CONNECTION SCHEMA 12 5 TECHICAL FEATURES 13 6 CONTROL PANEL 14 7 FIRST OPEATION AND USE 15 7 1 FIRST B...

Page 3: ...y and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and maintenan...

Page 4: ...strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 degrees do not attempt to feed cold water to t...

Page 5: ...g and waiting time on the electronic control panel Detoriations as a result of burning are minimised thanks to cast iron burning bunker Fan with quiet running cycle period and clap ensures maximum eff...

Page 6: ...6 3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 5 6...

Page 7: ...r must be connected to a good drawing chimney and minimum number of elbows should be used between chimney and boiler Boiler must be placed at a location with enough air intake for an efificient burnin...

Page 8: ...om one end of the pipes and to drain off at the other side Circulation pump must be installed on boiler water return pipe During installation there must be enough working space left for technical serv...

Page 9: ...n of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra se...

Page 10: ...10 BOILER INSTALLATION SCHEMA...

Page 11: ...ertical length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates...

Page 12: ...the building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cem...

Page 13: ...13 5 TECHNICAL SPECIFICATION...

Page 14: ...r fuel loading 04 255 sec Fuel feeding period setting button Sets fuel loading period 04 60 sec Fan Setting Button Sets speed level of fan From 1 to 5 Thermostat Setting Button Adjust the intended tem...

Page 15: ...iler lids must be closed and fan must be runned in low speed until the coal is completely combusted If fan blows too much air big slinders occurr because of the cooling effect of burning tank Make the...

Page 16: ...ses 5 C below set degree Running and stopping of circulation pump and fan can be monitored from flashing leds on digital indicator on control panel Circulation pump will run automatically for 3 second...

Page 17: ...nclogged Air holes must be cleaned up by turning on the fan for 15 minutes Electricity connection must be cut off before the maintainance Please ventilate the area before cleaning the boiler Electrici...

Page 18: ...18 10 ELECTRICITY SCHEMA...

Page 19: ...e comes from chimney connections Air holes which are inside the boiler can be blocked Clean up holes and smoke pipes regularly Boiler Chimney connections can be loosen Check the boiler chimney exit an...

Page 20: ...use of the supporting ring When the boiler is lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VE...

Reviews: