background image

 

1.GENERAL WARNING BEFORE OPERATING THE UNIT

 

 

 

Please check the conformity of waste gas , water and electric infrastucture  of  the area   

 

to the necessary technical parameters where the boiler will be installed. 

 

 

For safe use of electricity , make sure that the grounding of the installation is isolated 
and there is no phase. 

 

 

Your boiler is under guarantee for 2 years against component and production defects as  
long as  it is used in line with the suggestions in this manual. Our company cannot be held 
liable for any misuse of the product. 

 

 

Please do not use the boiler out of its purpose. The boiler is designed to supply hot water 
(maximum 90 degrees) to your heating system. 

 

 

Clean air must always be provided in the area where the boiler is installed. Due to reasons of 
security,  the installation of the boiler to closed areas with human presence is strictly 
forbidden. 

 

 

Please do not operate the boiler without water. Do not feed cold water to hot boiler. If,for 
any reason the boiler temprature is over 90 degrees, do not attempt to feed cold water to the 
boiler until the boiler temprature drops down to 40 degrees. The best solution for over 
heated boiler is to take out burning coal outside of the boiler 

 

 

Please do not drain the system water except repairing or during times of frost. 
Antifreeze   material can be added to sytem water up to 15% 

 

 

During operation, the temprature difference between return and flow can be maximum 20 

 

degrees. 

 

 

Water with high calcer rate is extremely dangerous for boiler and installation. In this 
case, please use water softeners . Product failures as a result of blocked water passes is 
out of scope of factory guarantee 

 

 

Each year,before start of heating season,the boiler’s chimney connection and internal parts 

 

must be checked and cleansed. This will enable efficient operation of the boiler. 

 

 

Please do not take hot water out of the boiler for domestic use purposes 

 

 
 
 
 
 
 
 
 
                                                                               

      

 

 
 
 
 

Summary of Contents for 25 MKK-S

Page 1: ...1...

Page 2: ...TION AND WATER FLOOD 9 BOILER INSTALLATION SCHEMA 10 4 2 AIR CONNECTION 11 4 3 CHIMNEY 11 CHIMNEY CONNECTION SCHEMA 12 5 TECHICAL FEATURES 13 6 CONTROL PANEL 14 7 FIRST OPEATION AND USE 15 7 1 FIRST B...

Page 3: ...y and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and maintenan...

Page 4: ...strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 degrees do not attempt to feed cold water to t...

Page 5: ...g and waiting time on the electronic control panel Detoriations as a result of burning are minimised thanks to cast iron burning bunker Fan with quiet running cycle period and clap ensures maximum eff...

Page 6: ...6 3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 5 6...

Page 7: ...r must be connected to a good drawing chimney and minimum number of elbows should be used between chimney and boiler Boiler must be placed at a location with enough air intake for an efificient burnin...

Page 8: ...om one end of the pipes and to drain off at the other side Circulation pump must be installed on boiler water return pipe During installation there must be enough working space left for technical serv...

Page 9: ...n of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra se...

Page 10: ...10 BOILER INSTALLATION SCHEMA...

Page 11: ...ertical length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates...

Page 12: ...the building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cem...

Page 13: ...13 5 TECHNICAL SPECIFICATION...

Page 14: ...r fuel loading 04 255 sec Fuel feeding period setting button Sets fuel loading period 04 60 sec Fan Setting Button Sets speed level of fan From 1 to 5 Thermostat Setting Button Adjust the intended tem...

Page 15: ...iler lids must be closed and fan must be runned in low speed until the coal is completely combusted If fan blows too much air big slinders occurr because of the cooling effect of burning tank Make the...

Page 16: ...ses 5 C below set degree Running and stopping of circulation pump and fan can be monitored from flashing leds on digital indicator on control panel Circulation pump will run automatically for 3 second...

Page 17: ...nclogged Air holes must be cleaned up by turning on the fan for 15 minutes Electricity connection must be cut off before the maintainance Please ventilate the area before cleaning the boiler Electrici...

Page 18: ...18 10 ELECTRICITY SCHEMA...

Page 19: ...e comes from chimney connections Air holes which are inside the boiler can be blocked Clean up holes and smoke pipes regularly Boiler Chimney connections can be loosen Check the boiler chimney exit an...

Page 20: ...use of the supporting ring When the boiler is lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VE...

Reviews: