5
1.1 GENERAL PRECAUTIONS BEFORE
USING
•
Check whether the mounting area complies with the technical
requirements for waste gas installation, water installation and electrical
installation.
•
For safety and safe use of electrical installation, make sure that the
isolated grounding is properly done and that the ground line is not phase-
misplaced.
•
Your pellet boiler is guaranteed for 2 (two) years against material and
manufacturing defects, provided that the warnings and standarts stated in
the operating instructions are followed.
The manufacturer is not
responsible for any faults or damages of the product results from
unintentional, incorrect or unintended use that are against to instructions.
•
Do not misuse the boilers. Our boilers are manufactured to provide hot
water (max. 90 degrees) to the heating system.
Water should never be
taken from the boiler for domestic use.
•
Permanent fresh air should be supplied to the area where the device is
installed. For safety, it is strictly forbidden to install boilers in enclosed
spaces where people live.
•
Do not operate boilers without water. Never supply cold water to a hot
boiler. If the boiler temperature has risen above 90 degrees , do not feed
cold water or increase the water level to cool down the boiler until the
boiler temperature decreases below 40 degrees. The best intervention to
an overheated boiler is to throw the burning fuel out of the boiler.
•
Water at the installation should not be discharged except for repairing or
frostbite . Antifreeze can be added to the installation water at a rate of
15% against frost hazard.
•
When the boiler is running, the difference between the flow and return
water should be at most 20 degrees.
•
Water that has h
igh amount of lime are extremely inconvenient for
boilers and installations. In such cases it is necessary to use softening
devices. Defects that may occur as a result of water leaks or blockages due
to lime in the boiler are not covered by the warranty. Every year before the
heating season, the boiler body, chimney connection pipes and chimney
must be controlled and cleaned. In this way, the system can be operated
more efficiently.
Summary of Contents for 25MKP
Page 1: ...1...
Page 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...
Page 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...
Page 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...
Page 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...
Page 28: ...28...