4.3 VENTILATION  

The area where the boiler is installed must always be suppplied with fresh air by 
opening a window or a duct. Fresh air is required in order to burn the fuel safely 
and efficiently. Otherwise once the burning starts, the oxygen level will drop and  
the burning will detoriate.  Detoriation of burning will cause decreasing burning 
efficiency and filling chimney with soot  and will require frequent cleaning. 

 

 

4.4 CHIMNEY 

l

 

The chimney that will be connected to the boiler must be independent. The chimney 

must be connected to provide a minimum draught. A boiler without chimney connection 
should not be operated. 

l

 

Chimney connection pipe and pipe systematic should be installed and checked by 
authorized people only. We remind you that the biggest factor in boiler efficiency is 
chimney design and draught. 

l

 

Proper chimney connection pipe should not be smaller than the boiler's chimney 
diameter, horizontal length must not be shorter than 60 cm and longer than 2 meters and 
pipe must be connected to the chimney with minimum 10 degree of angle. 

l

 

We suggest not to use enamel stove pipes as they cause tars in chimney connection pipe 
or chimney system. 

l

 

In case of an elbow use in chimney connection, the elbows must have round and wide 
angle. Quantity of an elbow must be maximum 2 pieces. 

l

 

Chimney connection must be installed to allow demounting from the boiler and avoid 
gas leaking. 

l

 

Chimney connection pipe must not be extended to the outside and must be connected 

to a chimney. 

l

 

Chimney connection pipe's contact  with flammable material must be avoided. 

l

 

Chimney connection pipe shouldn't be pushed inside the chimney. 

 The direction of the  chimney should not be changed. If there is a need to change 
directions,it must be positioned horizontally  by   60 degrees. 

l

 

The chimney must be leak proof and air transperancy from inside and outside must be 
avoided.

 

Do not connect more than one boiler and another device 

to same chimney. This 

would decrease chimney draught and  boiler efficiency. There should be no contact 
between the chimneys that are placed side by side

.  

 

l

 

There should be no sectional narrowing  in any part of the chimney. 

 

 
 

                                                      

Summary of Contents for 25MKP

Page 1: ...1...

Page 2: ...4 3 VENTILATION Page 12 4 4 CHIMNEY Page 12 4 5 CHIMNEY CONNECTION SCHEMA Page 13 5 TECNICAL SPECIFICATION TABLE Page 14 6 CONTROL PANEL Page 15 6 1 ERROR CODES Page 15 6 2 LCD SCREEN SYMBOLS Page 16...

Page 3: ...and continues its way in line with these principles This handbook is a helpful guide to the user for installing operating and maintaining the boiler For product breakdown and maintenance please contac...

Page 4: ...perating Danger of personal injury as result of the flame coming out of the combustion chamber Do not remove the outer cover sheets of the boiler do not open the protective covers Risk of burning as a...

Page 5: ...t is strictly forbidden to install boilers in enclosed spaces where people live Do not operate boilers without water Never supply cold water to a hot boiler If the boiler temperature has risen above 9...

Page 6: ...ty to monitor loading and standby times from the electronic control panel by adjusting from the digital display The erosion caused by heating has been minimized with the chromium combustion chamber Ex...

Page 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...

Page 8: ...ne with Reductor 7 Bunker 8 Fuel Loading Trap 9 Fuel Level Sensor 10 Chimney Temperature Sensor 11 Smoke Pipe Cleaning Mechanism Handle 12 Chimney Outlet 13 Circulation Inlet Connection 1 14 Fuel Load...

Page 9: ...leaned before the initial operation of the boiler The best way is to flood water from one side of the pipes and drain it from the other side The circulation pump should be mounted on the return pipe o...

Page 10: ...pipe used in installation at minimum lAn uninterruptible power supply may be used for electricity cut as an extra security measure lMount 3 bar security valve on the boiler for safety against over pre...

Page 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...

Page 12: ...n 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle lWe suggest not to use enamel stove pipes as they cause tars in chimney connection pipe or chimney system lIn case...

Page 13: ...outside the isolation must be done properly lThe chimney must be frequently cleaned in order to avoid tar soot and clogs that would prevent chimney draught lThere shouldn t be foreign objects cement...

Page 14: ...245 Working Pressure bar 3 Test Pressure bar 4 5 Circulation Inlet Outlet 1 Security Inlet 1 Security Outlet 1 Filling Draining 1 2 Boiler Setting Range Min Max C 35 90 Boiler Water Volume lt 46 Fuel...

Page 15: ...with up and down buttons Fuel Waiting Time sec If the factory settings do not suffice press the button once to change the fuel waiting values and adjust with up and down buttons Up Button Enter the m...

Page 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...

Page 17: ...D SREEN SYMBOLS Fan is Activated Reductor Engine is Activated Circulation Pump is Activated Error Symbol Burning Symbol Automatic Ignition Rezistance is Activated Heating Circuit is Working Fan Operat...

Page 18: ...the ignition the temperature and auto setting indications will flash interchangeably on the LCD screen When the combustion occurs the burning symbol appears on the screen and the boiler continues to r...

Page 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...

Page 20: ...me it prevents the circulation of unheated water to the radiators The boiler water temperature continuously decreases when the fuel is exhausted and the circulation pump is deactivated when it reaches...

Page 21: ...21 1 Never open the boiler doors 2 Open the bypass valves in the system if available 3 When power is back reset all settings...

Page 22: ...re prevented The air vents in the combustion chamber and the combustion chamber are automatically cleaned with the fan If any deterioration observes in the combustion combustion chamber can be cleaned...

Page 23: ...tting possibilities and set the desired DHW temperature from the operating panel In this case you will avoid overheating of the water and unnecessary fuel consumption Consume hot water under control L...

Page 24: ...onic card may have failed Call authorized service H4 Boiler is Overheated Electronic card sensor Boiler water may be missing Stop burning and do not flood water to boiler until it cools down Flood 1 5...

Page 25: ...boiler is open or not completely closed Temperature rises above 200 C Check that the front door of the boiler is closed User settings are set too high Rises above 200 C Return back to factory setting...

Page 26: ...eak Clean the chimney and check the draught Smoke Comes From Chimney Connections Boiler chimney connections may be loosen Check the boiler chimney outlet and pipe connections Chimney draught is weak C...

Page 27: ...e supporting ring When the boiler is lifted up with crane make sure there are no living beings left under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VE...

Page 28: ...28...

Reviews: