W
iring diagram
P 12/ 14
Fig. D-2
Switch
Controller
Connect Lead wire (white) and Lead wire (orange) to
Switch with Insulated terminal.
Be careful about the directions of the insulated terminals.
Insulated terminals
Battery
terminal
Stator complete
Rib B
Rib D
Rib F
Projection on
Flag terminal
Rib E
Rib C Connector 2-SD
Resistor unit
Line
filter
Rib A
When Line filter is used, insert it
between Rib E and Rib F.
Important:
Three Flag teminals and two straight teminals (
circled by red
)
have a lock structure, that enables you to remove the flag/ straight
terminals from the tab of Battery terminal with ease.
While pushing the projection of the flag/ straight teminal with
a slotted screwdriver to release the lock, pry off the flag/ straight
terminal from the tab of Battery terminal as shown left.
Note
: Check whether flag/ straight terminals have a lock structure
before disassembly as follows:
• Find the projection on flag/ straight terminals.
• Swing flag/ straight terminals slightly and gently to
feel a little backlash due to the lock structure.
Never force to pull any flag/ straight terminals !
Connect flag/ straight terminals onto the tabs of Battery terminals
until you can hear a tiny click sound.
Lead wires from Terminal must be
routed between Rib C and Rib D.
Thick Lead wire from Stator complete must be bent
to prevent pinching between Housing L and R.
Lead wires covered with a tube from Stator complete
must be placed under Thick lead wire.
Lead wires covered with a tube from Stator complete
must be routed between Rib A and Rib B.
Do not put any
Lead wires on
this boss.
Place Resistor unit and Connector 2-SD in the area
circled by a blue broken line. Connector 2-SD must
not be placed on/ under Noise suppressor (if used).
Be sure to use
Resistor unit.
Lead wire (white)
between Terminal 1
and Terminal 2
Lead wire (orange) from Controller
Battery terminal
Slotted screwdriver