BOXER SERIES80-120 KVA
INSTALLATION
AG-SD-37/ Publication Date: 19.10.2012/Rev. No:1/Rev. Date:16.11.2012
29
3.1.5.3 Cable Connections
UPS input, output and battery connection inlets are made from the front side of the UPS.
ATTENTION! 3 pole-circuit breakers (switch) are used for the input and
output of the UPS, Neutral line is not interrupted.
1
Input Terminals
2
Output Terminals
Please, follow the steps below for electrical connections:
1. Turn off all the breakers in the distribution boards to the open circuit (OFF) position and
make sure that loads and the mains are isolated from cables