C. Securing and Leveling the Appliance
WARNING! Risk of Fire!
Prevent contact with:
• Sagging or loose insulation
• Insulation backing or plastic
• Framing and other combustible materials
Block openings into the chase to prevent entry of blown-
in insulation. Make sure insulation and other materials
are secured.
DO NOT
notch the framing around the appliance
standoffs.
Failure to maintain air space clearance could cause
overheating and fire.
The diagram shows how to properly position and secure
the appliance. See Figure 6.18. Nailing tabs are provided
to secure the appliance to the framing members.
• Bend out nailing tabs on each side.
• Place the appliance into position.
• Keep nailing tabs flush with the framing.
• Plum, square and level the appliance from side to side
and front to back.
• Shim the appliance as necessary, keeping the bottom
supported, level and straight. It is acceptable to use
wood shims underneath the appliance.
• Place a level on top, sides and bottom as shown in Figure
6.18.
• Secure the appliance to the framing by using nails or
screws through the nailing tabs.
• Optional: Secure the appliance to the floor by inserting
two screws through the pilot holes at the bottom of the
appliance.
Figure 6.18 Proper Positioning and Securing of an Appliance
Figure 6.17 Heat-Zone
®
or Heat-Duct Locations
HEAT-ZONE
®
LOCATION
LEFT AND RIGHT SIDES
B. Installing the Optional Heat-Zone
®
or
Heat-Duct Gas Kit
NOTICE:
Additional clearances are required for Heat-
Zone® or Heat-Duct installations. Provisions must be made
in advance to ensure fit within the framing.
• Locate the Heat-Zone
®
or Heat-Duct ports on the left
and right sides of the appliance. Either one or two Heat-
Zones
®
may be installed.
See Figure 6.17. Remove the
knockouts from the appliance with a tin snips.
• Center the duct collar around the exposed hole and
attach it to the appliance with 3 screws. Note: Do this
BEFORE final positioning of the appliance.
• Determine the location for the air register/fan housing
assembly.
Reference the Heat-Zone
®
or Heat-Duct Gas Kit
instructions for the
remaining installation steps.
NAILING TABS