Majestic DBT33 Installation Instructions & Homeowner'S Manual Download Page 8

DBT33/DBT36/DBT39 -8- 

10002789/0

C

ONVERTING

 T

HE

 A

PPLIANCE

 

F

ROM

 LP 

TO

 N

ATURAL

 G

AS

 

OR

N

ATURAL

 G

AS

 

TO

 LP.

The 

DBT33 

is convertible between Natural Gas an LP gas 

(and vice-versa) with the use of a conversion kit purchased 
seperately, see your dealer for the correct part number.

The DBT36 & 39 can only be converted from 
Propane to Natural gas.

The conversion of this appliance from one gas 

to another must be carried out by an authorized 
service provider.

1.  Disconnect power to the unit and shut off the gas supply.
2.  Remove the glass/frame assembly.
3.  Carefully remove the logs & lava rock material
4.  Remove the screws that are holding the burner housing 

in place.

5.  Remove the burner housing.  Depending on the model of 

the appliance you may have to loosen the pilot bracket 
retaining screw/nut to allow the pilot and bracket assem-
bly to tilt and give enough clearance to remove the burner 
housing.

6.  Remove the main burner orifice and replace it with the  

orifice supplied in the conversion kit.  

7. 

SIT Top Convertible Pilot

Gently lift off the pilot hood from the pilot. (Do not 
remove the spring clip holding the hood in place).  Using 
a correctly sized Allen key unscrew the exposed orifice.  
Insert the new orifice supplied in the kit, do not over 
tighten the orifice.  Replace the pilot hood ensuring the 
index tab aligns with the notch on the hood.

 

PSE Pilot

Using a suitable wrench on the hexagonal body unscrew 
the pilot hood assembly from the pilot, do not twist the 
hood itself.  Remove the orifice and replace it with the 
new orifice supplied in the kit.  Refit the pilot hood 
assembly.  Do not over-tighten the pilot hood.  The hood 
must return to its original alignment.  Take care not to 
damage the thermocouple, thermopile or igniter.

9. 

SIT 820 NOVA Gas Control Valve

  (Fig. 9) 

a) Using a Torx T20 or slotted screwdriver, remove and 
save the three pressure regulator mounting screws (A), 
pressure regulator tower (B) and diaphragm (C).

 

b) Ensure the rubber gasket (D) is properly positioned and 
install the new Hi/Lo pressure regulator to the valve using 
the new screws (E) supplied with the kit.  Tighten screws 
securely. (Reference torque - 25 in.Lb).

 

c) Install the enclosed identification label (F) to the valve 
body where it can be easily seen.

 

Honeywell Gas Control Valve

  (Fig. 10) 

The Honeywell valve fitted to this unit is suitable 
for use with LP or Natural Gas.  It is converted to 
the required gas application by the installation of a 
colour coded “conversion screw”.

a) Using a suitable small screwdriver lift out the central 
regulator cap from the ‘Hi - Lo’ knob on the valve.

 

b) Unscrew the exposed conversion screw.

 

c) Insert the new colour coded conversion screw.  Do not 
over-tighten the screw, it must be finger tight.

 

d) Refit the regulator cap.

 

e) Mount the conversion label supplied with the conver-
sion screw to the valve in a visible position.

10.  Reassemble the fireplace in the reverse order, except for 

the front glass.  Leave this off until the unit has been 
checked for leaks and the gas supply line has been bled.

11.  After bleeding the gas line and checking for leaks with a 

soap solution, replace the front glass.  Fire up the unit, 
check for flame impingement on the logs, adjusting them 
if necessary.  Check the manifold and supply pressures 
against the appliance specifications.

The procedure for converting from one gas to 
another is the same regardless of the initial gas 
used.  The only variation is in the orifice sizes 
and component part numbers.  Your authorized 
service provider will ensure the correct parts are 
used.

Fig. 9

Fig. 10

Summary of Contents for DBT33

Page 1: ...y electric switch Do not use any phone in your building Immediately call yourgas supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call th...

Page 2: ...tion Instructions General Venting Information Terminal Location 9 Connecting Direct Vent Components 11 How To Use The Vent Graph 11 Vertical sidewall Applications 12 Vertical sidewall Installations 13...

Page 3: ...or decorations be hung on or around the replace 9 Under no circumstances should any solid fuels wood coal paper or cardboard etc be used in this replace 10 The ow of combustion and ventilation air mu...

Page 4: ...56 mm 14 406 mm 16 406 mm 16 G 810 mm 31 89 946 mm 37 25 946 mm 37 25 H 152 mm 6 181 mm 7 13 190 mm 7 5 I 149 mm 5 87 171 mm 6 75 159 mm 6 25 J 200 mm 7 87 254 mm 10 213 mm 8 38 K 297 mm 11 343 mm 13...

Page 5: ...rojects out 12 305 mm or more from the front of the replace Cold climate Installation Recommendation When installing this unit against a non insu lated exterior wall or chase it is mandatory that the...

Page 6: ...S SPECIFICATIONS Max Min Input Input Model Fuel Gas Control BTU h BTU h DBT33RN Nat Millivolt 15 000 10 500 DBT33RP Prop Millivolt 15 000 11 250 DBT36RN Nat Millivolt 18 000 12 600 DBT36RP Prop Milliv...

Page 7: ...necessary to provide a 1 8 test point up stream of the control When using copper or ex connectors use only approved t tings Always provide a union when using black iron pipe so that the gas line can...

Page 8: ...alignment Take care not to damage the thermocouple thermopile or igniter 9 SIT 820 NOVA Gas Control Valve Fig 9 a Using a Torx T20 or slotted screwdriver remove and save the three pressure regulator m...

Page 9: ...air supply inlet 72 inches 1828mm minimum L clearance above paved side walk or a paved driveway located on public property 84 inches 2133mm mini mum M clearance under veranda porch deck 12 inches 305...

Page 10: ...DBT33 DBT36 DBT39 10 10002789 0 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15...

Page 11: ...s with three sheet metal screws Fig 16 Wipe off excess sealant CANADIAN INSTALLATIONS The venting system must be installed in accordance with the current CAN CGA B149 1 or 2 installation code U S A IN...

Page 12: ...m number of 90 elbows per side wall instal lation is three 3 If a 90 elbow is tted directly onto the replace ange the maximum horizontal vent run before the termination is 36 914 mm If a 90 elbow is u...

Page 13: ...restop with 8 sheet metal screws supplied Install restop assembly Fig 23 Zero clearance sleeve is only required for combustible walls STEP 3 Place replace into position Fig 24 Measure the vertical hei...

Page 14: ...positioned BELOW GRADE INSTALLATIONS When it is not possible to meet the required vent terminal clearances of 12 305mm above grade level a snorkel vent kit is recommended It allows installation depth...

Page 15: ...H THE ROOF APPLICATIONS This Gas Fireplace has been approved for Vertical installations up to 40 12 m in height Up to a 10 horizontal vent run can be installed within the vent system using a maximum o...

Page 16: ...e MUST BE FITTED TO THE APPLIANCE at installation Fitting The Restrictor Plate 1 Remove the window glass frame assembly 2 Locate the rebox baf e assembly in the top rear area of the rebox Fig 32 3 Rem...

Page 17: ...ion and secure Fig 35 7 Install roof support Fig 36 and roof ashing making sure upper ange of ashing is below the shingles Fig 37 8 Install appropriate pipe sections until the venting is above the ash...

Page 18: ...ation Offsets 90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP183...

Page 19: ...llation 45 elbow kit 7TDV45 for Vertical Installation Offsets 90 transition elbow kit 7TDV90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable...

Page 20: ...th lemon oil Do not use water or household cleaners on any brass components LOUVRE REMOVAL The top louvre panel is removed by lifting the panel vertically and pulling it away from the appliance Fig 39...

Page 21: ...he right support bracket located over the burner housing and place the log in position 6 Place the left top log in position by aligning the hole on the underside of the log with the lug on the top fac...

Page 22: ...ar the centre of the gas control valve Fig 44 45 FLAME CHARACTERISTICS It is important to periodically perform a visual check of the pilot and burner ames Compare them to the pictorials illus trated b...

Page 23: ...gas go to the next step 7 Remove glass door before lighting pilot See Glass Frame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counter clockwise to PILOT nei...

Page 24: ...DBT33 DBT36 DBT39 24 10002789 0 TROUBLE SHOOTING THE GAS CONTROL SYSTEM HONEYWELL MILLIVOLT VALVE...

Page 25: ...pplied must be used to conduct this test 3 Pilot burning no gas to A Wall switch or wires defective Check wall switch and wires for proper connections main burner Jumper wire across terminals at wall...

Page 26: ...Pilot assembly SIT Top convertible RP 10002265 N A N A 5 Pilot SIT N A 10001295 10001295 6 Pilot SIT Top convertible 10002266 N A N A Pilot ori ce SIT Nat N A 54273 54273 Pilot ori ce SIT Prop N A 542...

Page 27: ...0002822 10001781 10002821 Gasket window glass 57317 57317 57317 19 Clamp window frame assembly 54174 54174 54174 20 Window trim polished brass with magnets 55005 57480 57483 21 Top louvre assembly 100...

Page 28: ...DBT33 DBT36 DBT39 28 10002789 0 PARTS PICTORIAL...

Page 29: ...he white wire of the power line to the chrome screw of the socket assembly 8 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 9 Re t the socket assem...

Page 30: ...trol will require suitable extension of the component wiring 4 The power supply may be connected in 2 ways Method A Route the 6 lead tted to the unit to a conveniently located wall socket Method B The...

Page 31: ...efractory panels into place to hold the rear panel secure Adjust the top adjustable tabs to hold the side panel against the rebox wall and secure the tab Repeat the procedure on the other side 8 Repla...

Page 32: ...ssemble the Bay Window Kit according to the instruc tions supplied with the kit 5 Place the 2 pieces of ceramic refractory along the base of the bay window Fig 59 6 Hang the Bay Window Assembly over t...

Page 33: ...10002789 0 33 DBT33 DBT36 DBT39...

Page 34: ...VEAU FOYER AU GAZ AJESTIC NC CONTRE TOUS D FAUTS DE FABRICATION ET DE MATI RES PREMI RES POUR UNE P RIODE DgUN AN COMPTER DE LA DATE DgINSTALLATION SUJET AUX CONDITIONS ET LIMITATIONS SUIVANTES 2 4 6...

Reviews: