Majestic DBT33 Installation Instructions & Homeowner'S Manual Download Page 12

DBT33/DBT36/DBT39 -12- 

10002789/0

V

ERTICAL

 S

IDEWALL

 A

PPLICATIONS

Since it is very important that the venting system 
maintain its balance between the combustion air 
intake and the flue gas exhaust, certain limita-
tions as to vent configurations apply and must 
be strictly adhered to.

The Vent Graph showing the relationship between vertical and 
horizontal side wall venting will help to determine the various 
dimensions allowable.  

Minimum clearance between vent pipes and 
combustible materials is one 1"(25mm) on top, 
bottom and sides unless otherwise noted.

When vent termination exits through foundations less than 20" 
below siding outcrop, the vent pipe must flush up with the 
siding.  
It is always best to locate the fireplace in such a way that 
minimizes the number of offsets and horizontal vent length.
The horizontal vent run refers to the total length of vent pipe 
from the flue collar of the fireplace to the face of the outer 
wall.
Horizontal plane means no vertical rise exists on this portion 
of the vent assembly.
• 

The maximum number of 90º elbows per side wall instal-
lation is three (3).  

• 

If a 90º elbow is fitted directly onto the fireplace flange 
the maximum horizontal vent run before the termination  
is 36" (914 mm).

• 

If a 90º elbow is used in the horizontal vent run (level 
height maintained) the maximum horizontal vent length is 
reduced by 36" (914 mm), (Fig. 20).  This does not apply 
if the 90º elbows are used to increase or redirect a vertical 
rise (Fig. 21).

 

Example:  According to the chart the maximum horizontal 
vent length in a system with a 7.5' vertical rise is 20' (6 m) 
and if a 90º elbow is required in the horizontal vent it must 
be reduced to 17' (5.2 m).

 

In Fig. 20 Dimension A plus B must not be greater than 
17' (5.2 m).

• 

The maximum number of 45º elbows permitted per side 
wall installation is two (2). These elbows can be installed 
in either the vertical or horizontal run. 

• 

For each 45º elbow installed in the horizontal run, the 
length of the horizontal run MUST be reduced by 18" 
(45cm). This does not apply if the  45º elbows are 
installed on the vertical part of the vent system.

• 

The maximum number of elbow degrees in a system is 
270º (See Fig. 21).

 

Example:  In Figure 21

 Elbow 

90º

 Elbow 

45º

 Elbow 

45º

 Elbow 

90º

 

Total angular variation 

270º

Fig. 18

Fig. 19

Fig. 20

Fig. 21

Summary of Contents for DBT33

Page 1: ...y electric switch Do not use any phone in your building Immediately call yourgas supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call th...

Page 2: ...tion Instructions General Venting Information Terminal Location 9 Connecting Direct Vent Components 11 How To Use The Vent Graph 11 Vertical sidewall Applications 12 Vertical sidewall Installations 13...

Page 3: ...or decorations be hung on or around the replace 9 Under no circumstances should any solid fuels wood coal paper or cardboard etc be used in this replace 10 The ow of combustion and ventilation air mu...

Page 4: ...56 mm 14 406 mm 16 406 mm 16 G 810 mm 31 89 946 mm 37 25 946 mm 37 25 H 152 mm 6 181 mm 7 13 190 mm 7 5 I 149 mm 5 87 171 mm 6 75 159 mm 6 25 J 200 mm 7 87 254 mm 10 213 mm 8 38 K 297 mm 11 343 mm 13...

Page 5: ...rojects out 12 305 mm or more from the front of the replace Cold climate Installation Recommendation When installing this unit against a non insu lated exterior wall or chase it is mandatory that the...

Page 6: ...S SPECIFICATIONS Max Min Input Input Model Fuel Gas Control BTU h BTU h DBT33RN Nat Millivolt 15 000 10 500 DBT33RP Prop Millivolt 15 000 11 250 DBT36RN Nat Millivolt 18 000 12 600 DBT36RP Prop Milliv...

Page 7: ...necessary to provide a 1 8 test point up stream of the control When using copper or ex connectors use only approved t tings Always provide a union when using black iron pipe so that the gas line can...

Page 8: ...alignment Take care not to damage the thermocouple thermopile or igniter 9 SIT 820 NOVA Gas Control Valve Fig 9 a Using a Torx T20 or slotted screwdriver remove and save the three pressure regulator m...

Page 9: ...air supply inlet 72 inches 1828mm minimum L clearance above paved side walk or a paved driveway located on public property 84 inches 2133mm mini mum M clearance under veranda porch deck 12 inches 305...

Page 10: ...DBT33 DBT36 DBT39 10 10002789 0 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15...

Page 11: ...s with three sheet metal screws Fig 16 Wipe off excess sealant CANADIAN INSTALLATIONS The venting system must be installed in accordance with the current CAN CGA B149 1 or 2 installation code U S A IN...

Page 12: ...m number of 90 elbows per side wall instal lation is three 3 If a 90 elbow is tted directly onto the replace ange the maximum horizontal vent run before the termination is 36 914 mm If a 90 elbow is u...

Page 13: ...restop with 8 sheet metal screws supplied Install restop assembly Fig 23 Zero clearance sleeve is only required for combustible walls STEP 3 Place replace into position Fig 24 Measure the vertical hei...

Page 14: ...positioned BELOW GRADE INSTALLATIONS When it is not possible to meet the required vent terminal clearances of 12 305mm above grade level a snorkel vent kit is recommended It allows installation depth...

Page 15: ...H THE ROOF APPLICATIONS This Gas Fireplace has been approved for Vertical installations up to 40 12 m in height Up to a 10 horizontal vent run can be installed within the vent system using a maximum o...

Page 16: ...e MUST BE FITTED TO THE APPLIANCE at installation Fitting The Restrictor Plate 1 Remove the window glass frame assembly 2 Locate the rebox baf e assembly in the top rear area of the rebox Fig 32 3 Rem...

Page 17: ...ion and secure Fig 35 7 Install roof support Fig 36 and roof ashing making sure upper ange of ashing is below the shingles Fig 37 8 Install appropriate pipe sections until the venting is above the ash...

Page 18: ...ation Offsets 90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP183...

Page 19: ...llation 45 elbow kit 7TDV45 for Vertical Installation Offsets 90 transition elbow kit 7TDV90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable...

Page 20: ...th lemon oil Do not use water or household cleaners on any brass components LOUVRE REMOVAL The top louvre panel is removed by lifting the panel vertically and pulling it away from the appliance Fig 39...

Page 21: ...he right support bracket located over the burner housing and place the log in position 6 Place the left top log in position by aligning the hole on the underside of the log with the lug on the top fac...

Page 22: ...ar the centre of the gas control valve Fig 44 45 FLAME CHARACTERISTICS It is important to periodically perform a visual check of the pilot and burner ames Compare them to the pictorials illus trated b...

Page 23: ...gas go to the next step 7 Remove glass door before lighting pilot See Glass Frame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counter clockwise to PILOT nei...

Page 24: ...DBT33 DBT36 DBT39 24 10002789 0 TROUBLE SHOOTING THE GAS CONTROL SYSTEM HONEYWELL MILLIVOLT VALVE...

Page 25: ...pplied must be used to conduct this test 3 Pilot burning no gas to A Wall switch or wires defective Check wall switch and wires for proper connections main burner Jumper wire across terminals at wall...

Page 26: ...Pilot assembly SIT Top convertible RP 10002265 N A N A 5 Pilot SIT N A 10001295 10001295 6 Pilot SIT Top convertible 10002266 N A N A Pilot ori ce SIT Nat N A 54273 54273 Pilot ori ce SIT Prop N A 542...

Page 27: ...0002822 10001781 10002821 Gasket window glass 57317 57317 57317 19 Clamp window frame assembly 54174 54174 54174 20 Window trim polished brass with magnets 55005 57480 57483 21 Top louvre assembly 100...

Page 28: ...DBT33 DBT36 DBT39 28 10002789 0 PARTS PICTORIAL...

Page 29: ...he white wire of the power line to the chrome screw of the socket assembly 8 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 9 Re t the socket assem...

Page 30: ...trol will require suitable extension of the component wiring 4 The power supply may be connected in 2 ways Method A Route the 6 lead tted to the unit to a conveniently located wall socket Method B The...

Page 31: ...efractory panels into place to hold the rear panel secure Adjust the top adjustable tabs to hold the side panel against the rebox wall and secure the tab Repeat the procedure on the other side 8 Repla...

Page 32: ...ssemble the Bay Window Kit according to the instruc tions supplied with the kit 5 Place the 2 pieces of ceramic refractory along the base of the bay window Fig 59 6 Hang the Bay Window Assembly over t...

Page 33: ...10002789 0 33 DBT33 DBT36 DBT39...

Page 34: ...VEAU FOYER AU GAZ AJESTIC NC CONTRE TOUS D FAUTS DE FABRICATION ET DE MATI RES PREMI RES POUR UNE P RIODE DgUN AN COMPTER DE LA DATE DgINSTALLATION SUJET AUX CONDITIONS ET LIMITATIONS SUIVANTES 2 4 6...

Reviews: