Majestic DBT33 Installation Instructions & Homeowner'S Manual Download Page 21

10002789/0 -21- 

DBT33/DBT36/DBT39

I

NSTALLATION

 

OF

 L

OGS

 

& L

AVA

 R

OCK

Refer to the log identification chart to identify specific log 
numbers.

1.  Remove the front glass / frame assembly.

2.  Remove the logs from their packaging.

The logs are fragile and should be handled 
with care.  
Keep the packaging material out of the reach of 
children and dispose of the material in a safe 
manner

3.  Place the rear log (see chart for identification number) 

in the rear support channel.  The flat face should be flat 
against the rear of the firebox and the log should be central 
in the channel.

Align the holes in the base of the left front log with the 
studs on the left support bracket located over the burner 
housing and place the log in position.

5.  Align the holes in the base of the right front log with the 

studs on the right support bracket located over the burner 
housing and place the log in position.

6.  Place the left top log in position by aligning the hole on 

the underside of the log with the lug on the top face of 
the rear log.  The front end of the log rests in the cut-out 
on the left front log.

7.  Place the right top log in position by aligning the hole on 

the underside of the log with the lug on the top face of 
the rear log.  The front end of the log rests in the cut-out 
on the right front log.

8.  Scatter the ember material over the burner housing in font 

of the 2 front logs.  Do not pack this material tightly, 
separate it when unpacked and keep it in a loose condi-
tion.

9.  Scatter the lava rock material around the firebox base. 

Do not place any of the lava rock material on 
the burner housing.

Log Identification Chart

Location DBT33 

DBT36 

DBT39 

Front left 

BA2 

BB6 

BC5 

Front right 

BA3 

BB7 

BC6 

Rear BA4 

BB8 

BC7 

Top left 

BA5 

BB9 

BC8 

Top right 

BA6 

BB10 

BC9 

Fig. 41

Fig. 42

Fig. 43

DBT33

DBT36

DBT39

Summary of Contents for DBT33

Page 1: ...y electric switch Do not use any phone in your building Immediately call yourgas supplier from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call th...

Page 2: ...tion Instructions General Venting Information Terminal Location 9 Connecting Direct Vent Components 11 How To Use The Vent Graph 11 Vertical sidewall Applications 12 Vertical sidewall Installations 13...

Page 3: ...or decorations be hung on or around the replace 9 Under no circumstances should any solid fuels wood coal paper or cardboard etc be used in this replace 10 The ow of combustion and ventilation air mu...

Page 4: ...56 mm 14 406 mm 16 406 mm 16 G 810 mm 31 89 946 mm 37 25 946 mm 37 25 H 152 mm 6 181 mm 7 13 190 mm 7 5 I 149 mm 5 87 171 mm 6 75 159 mm 6 25 J 200 mm 7 87 254 mm 10 213 mm 8 38 K 297 mm 11 343 mm 13...

Page 5: ...rojects out 12 305 mm or more from the front of the replace Cold climate Installation Recommendation When installing this unit against a non insu lated exterior wall or chase it is mandatory that the...

Page 6: ...S SPECIFICATIONS Max Min Input Input Model Fuel Gas Control BTU h BTU h DBT33RN Nat Millivolt 15 000 10 500 DBT33RP Prop Millivolt 15 000 11 250 DBT36RN Nat Millivolt 18 000 12 600 DBT36RP Prop Milliv...

Page 7: ...necessary to provide a 1 8 test point up stream of the control When using copper or ex connectors use only approved t tings Always provide a union when using black iron pipe so that the gas line can...

Page 8: ...alignment Take care not to damage the thermocouple thermopile or igniter 9 SIT 820 NOVA Gas Control Valve Fig 9 a Using a Torx T20 or slotted screwdriver remove and save the three pressure regulator m...

Page 9: ...air supply inlet 72 inches 1828mm minimum L clearance above paved side walk or a paved driveway located on public property 84 inches 2133mm mini mum M clearance under veranda porch deck 12 inches 305...

Page 10: ...DBT33 DBT36 DBT39 10 10002789 0 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15...

Page 11: ...s with three sheet metal screws Fig 16 Wipe off excess sealant CANADIAN INSTALLATIONS The venting system must be installed in accordance with the current CAN CGA B149 1 or 2 installation code U S A IN...

Page 12: ...m number of 90 elbows per side wall instal lation is three 3 If a 90 elbow is tted directly onto the replace ange the maximum horizontal vent run before the termination is 36 914 mm If a 90 elbow is u...

Page 13: ...restop with 8 sheet metal screws supplied Install restop assembly Fig 23 Zero clearance sleeve is only required for combustible walls STEP 3 Place replace into position Fig 24 Measure the vertical hei...

Page 14: ...positioned BELOW GRADE INSTALLATIONS When it is not possible to meet the required vent terminal clearances of 12 305mm above grade level a snorkel vent kit is recommended It allows installation depth...

Page 15: ...H THE ROOF APPLICATIONS This Gas Fireplace has been approved for Vertical installations up to 40 12 m in height Up to a 10 horizontal vent run can be installed within the vent system using a maximum o...

Page 16: ...e MUST BE FITTED TO THE APPLIANCE at installation Fitting The Restrictor Plate 1 Remove the window glass frame assembly 2 Locate the rebox baf e assembly in the top rear area of the rebox Fig 32 3 Rem...

Page 17: ...ion and secure Fig 35 7 Install roof support Fig 36 and roof ashing making sure upper ange of ashing is below the shingles Fig 37 8 Install appropriate pipe sections until the venting is above the ash...

Page 18: ...ation Offsets 90 transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7DVP1018 10 to 18 adjustable length 7DVP183...

Page 19: ...llation 45 elbow kit 7TDV45 for Vertical Installation Offsets 90 transition elbow kit 7TDV90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18 adjustable...

Page 20: ...th lemon oil Do not use water or household cleaners on any brass components LOUVRE REMOVAL The top louvre panel is removed by lifting the panel vertically and pulling it away from the appliance Fig 39...

Page 21: ...he right support bracket located over the burner housing and place the log in position 6 Place the left top log in position by aligning the hole on the underside of the log with the lug on the top fac...

Page 22: ...ar the centre of the gas control valve Fig 44 45 FLAME CHARACTERISTICS It is important to periodically perform a visual check of the pilot and burner ames Compare them to the pictorials illus trated b...

Page 23: ...gas go to the next step 7 Remove glass door before lighting pilot See Glass Frame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counter clockwise to PILOT nei...

Page 24: ...DBT33 DBT36 DBT39 24 10002789 0 TROUBLE SHOOTING THE GAS CONTROL SYSTEM HONEYWELL MILLIVOLT VALVE...

Page 25: ...pplied must be used to conduct this test 3 Pilot burning no gas to A Wall switch or wires defective Check wall switch and wires for proper connections main burner Jumper wire across terminals at wall...

Page 26: ...Pilot assembly SIT Top convertible RP 10002265 N A N A 5 Pilot SIT N A 10001295 10001295 6 Pilot SIT Top convertible 10002266 N A N A Pilot ori ce SIT Nat N A 54273 54273 Pilot ori ce SIT Prop N A 542...

Page 27: ...0002822 10001781 10002821 Gasket window glass 57317 57317 57317 19 Clamp window frame assembly 54174 54174 54174 20 Window trim polished brass with magnets 55005 57480 57483 21 Top louvre assembly 100...

Page 28: ...DBT33 DBT36 DBT39 28 10002789 0 PARTS PICTORIAL...

Page 29: ...he white wire of the power line to the chrome screw of the socket assembly 8 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 9 Re t the socket assem...

Page 30: ...trol will require suitable extension of the component wiring 4 The power supply may be connected in 2 ways Method A Route the 6 lead tted to the unit to a conveniently located wall socket Method B The...

Page 31: ...efractory panels into place to hold the rear panel secure Adjust the top adjustable tabs to hold the side panel against the rebox wall and secure the tab Repeat the procedure on the other side 8 Repla...

Page 32: ...ssemble the Bay Window Kit according to the instruc tions supplied with the kit 5 Place the 2 pieces of ceramic refractory along the base of the bay window Fig 59 6 Hang the Bay Window Assembly over t...

Page 33: ...10002789 0 33 DBT33 DBT36 DBT39...

Page 34: ...VEAU FOYER AU GAZ AJESTIC NC CONTRE TOUS D FAUTS DE FABRICATION ET DE MATI RES PREMI RES POUR UNE P RIODE DgUN AN COMPTER DE LA DATE DgINSTALLATION SUJET AUX CONDITIONS ET LIMITATIONS SUIVANTES 2 4 6...

Reviews: